How Much Does a Laundry Renovation Cost in Australia? (2026)

A renovated modern Australian laundry with custom cabinetry, a stone benchtop and an integrated front-loading washing machine.

Last updated: 4 June 2026 · By Mossy Tariq, Founder — Property Blueprint Co.

A laundry is the room most Australians under-budget and over-pay for at the same time. They under-budget because it looks like the simplest room in the house — a tub, a bench, a couple of cupboards. They over-pay because that same room hides plumbing, drainage, waterproofing and ventilation behind the cabinetry, and every one of those is a trade with a day rate.

The published numbers tell the story. Across the 2025–26 cost guides, an Australian laundry renovation runs anywhere from about $3,000 for a cosmetic refresh to $30,000-plus for a full custom rebuild — Three Birds Renovations puts the typical span at $5,000 to $30,000, and most professionally completed projects land between roughly $8,000 and $18,000. A ten-times range on a single room is not vagueness. It is the gap between two homeowners making different decisions before a single trade quoted.

This article gives you the real ranges, shows you where the money goes trade by trade, and names the decisions that move the number — so the price of your laundry is one you set, not one you discover.

A laundry renovation doesn't have a price. It has a set of decisions — and each one you skip becomes a number someone else picks for you.

The figures below are Australian, 2026, and drawn from the published cost guides. Your laundry will sit somewhere inside these ranges; where exactly is the thing you control.

◆ ◆ ◆

What does a laundry renovation actually cost in Australia in 2026

A laundry renovation in Australia in 2026 falls into three clear tiers, and the published guides agree on them to within a few thousand dollars. The tier you land in is set by one question: does the plumbing stay where it is, or does it move?

  • Cosmetic refresh — $3,000 to $8,000. New tapware and sink, a laminate benchtop, flat-pack cabinetry, fresh paint, a splashback, and minor electrical work, with the existing layout left in place. This is the landlord-and-quick-update tier.
  • Standard full renovation — $8,000 to $18,000. Semi-custom or custom cabinetry, a stone or engineered-stone benchtop, floor tiling, a new sink and mixer, extra power points and lighting, and minor plumbing adjustments. This is the tier most owner-occupiers actually choose.
  • High-end custom — $18,000 to $30,000-plus. Full custom joinery, premium stone, full-height tiling, relocated plumbing, designer tapware and integrated appliances. The 2026 co-architecture cost guide puts a full rebuild with plumbing changes at $18,000 to $30,000-plus, and a combined laundry-and-bathroom reconfiguration higher again.

Those tiers hold nationally. City variation exists — metropolitan labour rates rose an estimated five to seven percent from 2025 into 2026 on the back of trade shortages, per the renovation cost guides tracking Housing Industry Association labour data — so a Sydney or Canberra laundry trends to the upper half of each band, and a regional project to the lower half. But the tier is set by scope, and scope is set by you.

◆ ◆ ◆

Why the same laundry costs one homeowner $5,000 and another $20,000

The single biggest cost lever in a laundry renovation is whether the plumbing moves. Keep the sink, the washing-machine taps and the floor waste where they already are, and the laundry stays a cosmetic job. Move any of them — to shift the tub to the other wall, to fit a different layout, to add a second machine — and three trades arrive instead of one: a plumber to relocate the supply and waste, a tiler to lift and re-lay around the new falls, and often an electrician to follow the new layout.

That is why the range is so wide. A homeowner who designs the new laundry around the existing plumbing pays once. A homeowner who moves the plumbing for a better layout pays for the relocation, the re-waterproofing, the re-tiling, and the schedule time the other trades wait while it happens. Neither is wrong. But one is a $5,000 decision and the other is a $20,000 one, and most homeowners do not realise they have made it until the quote arrives.

The second lever is cabinetry. Flat-pack from a hardware chain and full custom joinery do the same job on paper and cost three times apart in practice. The third is the benchtop — laminate against engineered stone is a several-thousand-dollar swing on a run of bench most people could not pick blindfolded once it is installed.

The decision that sets the tier

Before you look at a single tap or tile, answer one question in writing: is the plumbing staying exactly where it is?

If yes, you are in the $3,000–$18,000 range and the rest is finish selection. If no, you are in the $18,000-plus range and you are running a wet-area renovation, not a refresh. Every other decision is downstream of that one.

Where the money actually goes in a laundry renovation

A laundry quote arrives as a single number, but it is built from five separate cost centres. Knowing the split is what lets you tell a fair quote from a padded one, and what lets you cut cost without cutting quality.

  • Cabinetry and benchtop — roughly 30 to 40 percent. The largest line in most laundries. Flat-pack carcasses with a laminate top sit at the bottom; custom joinery with stone sits at the top.
  • Labour across trades — roughly 25 to 35 percent. Plumber, electrician, tiler, cabinetmaker and, on a wet-area job, a waterproofer. Labour is where relocating plumbing compounds, because it multiplies the trades involved rather than just adding one.
  • Tiling and waterproofing — roughly 15 to 25 percent. Floor tiling, any splashback or full-height tiling, and the waterproofing membrane beneath it. A splashback-only laundry tiles cheaply; a full-height, floor-to-ceiling laundry does not.
  • Fixtures and tapware — roughly 10 to 15 percent. Sink, mixer, and any feature tapware. The range between builder-standard and designer here is entirely yours to set.
  • Appliances and the rest — the balance. Any new washer or dryer, ventilation, lighting and the small unquoted extras that accumulate.

The pattern that matters: the two largest cost centres — cabinetry and labour — are also the two most affected by the plumbing decision in section two. That is not a coincidence. It is why one decision moves the whole number.

Get your laundry cost baseline first

The free Renovation Cost Calculator gives you a trade-by-trade estimate in under 5 minutes — before your first trade conversation. It is the benchmark you measure every quote against, so a high number gets questioned instead of paid.

Use the free calculator →

Which decisions move the price the most

Four decisions account for most of the spread between a $5,000 laundry and a $25,000 one. Make them deliberately, before you brief a trade, and you choose your tier instead of inheriting it.

  1. Plumbing: stays or moves. The tier-setter. Designing around the existing rough-in is the single largest saving available on any laundry.
  2. Cabinetry: flat-pack, semi-custom, or full custom. A three-times cost swing on the largest line item. A mixed approach — flat-pack carcasses with one custom feature element — often buys most of the look for a fraction of the full-custom price.
  3. Tiling: splashback or full-height. Tiling is priced by the square metre laid plus the waterproofing beneath it. Full-height tiling on every wall is a finish choice, not a structural one, and it is one of the easiest places to over-spend without noticing.
  4. Benchtop: laminate or stone. A several-thousand-dollar decision on a surface that takes washing baskets, not dinner guests. Worth spending where it earns its place; worth questioning where it does not.
  5. Ventilation and drainage: specified or assumed. The two cheapest things to get right and the two most expensive to fix later, so they belong in the brief as line items rather than left as the trade's assumption.

Each of these is a decision you can make at the kitchen table, in writing, before any trade is involved. That document — the one that says exactly what you are and are not doing — is what turns a vague enquiry into a quote you can actually trust.

How to get a laundry quote you can actually compare

The reason three laundry quotes come back $6,000 apart is rarely that one trade is dishonest. It is that each priced a slightly different renovation, because the brief left the gaps for them to fill. Fix the brief and the quotes converge.

Write a scope document before you contact anyone: the layout (and whether plumbing moves), the cabinetry type, the benchtop material, the tiling extent, the fixtures, and what you are keeping. Issue the same document to every trade. Now the quotes price the same job, and the differences that remain are real — labour rates and inclusions — not guesses. This is the same discipline that separates a comparable kitchen quote from an uncomparable one; the mechanics of reading a renovation quote line by line apply identically to a laundry, on a smaller scale.

When a quote comes back, read it for the three things laundry quotes hide: what waterproofing and floor preparation is included, whether plumbing relocation is priced or excluded, and what is listed as a provisional sum that will be trued up later. Those three are where a clean-looking quote becomes a variation invoice three weeks in.

◆ ◆ ◆

What the cheapest laundry renovation quietly gets wrong

The cheapest laundry renovation is not the one with the lowest quote. It is the one that does not come back. And the two things that bring a budget laundry back — at full price, eighteen months later — are drainage and ventilation, because they are invisible until they fail.

Drainage that was not re-graded when the floor was re-laid pools water at the wrong end of the room. A laundry with no dedicated exhaust traps the moisture a washing machine and a sink produce all day, and that moisture finds the cheapest cabinetry and the unsealed join. Neither shows up at handover. Both show up after the warranty conversation has gone cold.

This is the false economy at the bottom of the market: saving $2,000 by skipping proper falls, waterproofing verification, or a rangehood-grade exhaust, then spending $8,000 to rectify water damage that a $200 hold-point inspection would have caught. The cheap laundry and the expensive laundry are often the same laundry, twice. Knowing the phase where waterproofing must be signed off — before any tile is laid — is what keeps a budget renovation from becoming a rebuild.

◆ ◆ ◆

Where a laundry renovation budget actually starts

A laundry budget does not start with a quote. It starts with a scope you wrote and a baseline number you can defend — because the homeowner who walks into the first trade conversation already knowing the trade-by-trade cost is the homeowner the trade prices accurately, not the one they price to.

That preparation is what The 12-Phase System exists to do — Property Blueprint Co.'s named method for taking a renovation from the first cost question to final sign-off without paying the variation premium the unprepared homeowner pays. The Laundry Renovation Blueprint runs the laundry-specific version: the layout decisions, the plumbing-stays-or-moves call, the waterproofing hold point, the scope document, and the trade-by-trade sequence, in the order they have to happen. Built by someone who has run them.

See The Laundry Renovation Blueprint

Every laundry decision, in order — before it becomes a number someone else picks.

View The Laundry Renovation Blueprint →

If the cost baseline is the right first step, use the free Renovation Cost Calculator — a trade-by-trade estimate for your specific laundry, in under 5 minutes, before any trade has quoted.

◆ ◆ ◆

Frequently asked questions

How much does a laundry renovation cost in Australia in 2026?

An Australian laundry renovation in 2026 typically costs $3,000 to $8,000 for a cosmetic refresh, $8,000 to $18,000 for a standard full renovation, and $18,000 to $30,000-plus for a high-end custom rebuild. Most professionally completed projects land between $8,000 and $18,000. The tier is set by one decision: whether the plumbing stays where it is or moves.

What is the biggest cost in a laundry renovation?

Cabinetry and the benchtop are the single largest cost centre in most laundries, at roughly 30 to 40 percent of the total, followed by labour across trades at 25 to 35 percent. Both are driven by whether the plumbing moves, because relocating plumbing multiplies the trades involved and forces custom cabinetry to fit a new layout.

Why are my laundry renovation quotes so different from each other?

Laundry quotes come back thousands of dollars apart when the brief leaves gaps for each trade to fill differently. The fix is a written scope document issued identically to every trade, so each prices the same job. The differences that remain are then real, not guesses.

Can I save money by keeping the existing laundry layout?

Yes. Keeping the plumbing where it is, is the single largest saving available on a laundry renovation. Designing the new laundry around the existing sink, taps and floor waste keeps the job in the cosmetic-to-standard range. Moving the plumbing brings in a plumber, re-waterproofing, re-tiling and additional schedule time, and typically lifts the project into the high-end tier.

Does a laundry renovation need waterproofing?

A laundry is a wet area, and where tiling and a floor waste are involved, waterproofing applies and must be signed off before tiling begins. Skipping or failing to verify it is the most common false economy in a budget laundry, because water damage from an unverified membrane surfaces after the warranty period and costs many times the inspection it would have taken to prevent.

How long does a laundry renovation take?

A cosmetic laundry refresh can be completed in one to two weeks; a standard full renovation typically runs three to five weeks once long-lead items like custom cabinetry and stone benchtops are accounted for, as both carry several weeks of lead time and must be ordered before site work begins. Relocating plumbing extends the timeline because trades must work in sequence rather than in parallel.

Keep reading: the laundry renovation mistakes that cost the most.


FREE RENOVATION COST CALCULATOR

Not sure what your renovation should cost?

Most homeowners receive their first renovation quote with no frame of reference. They don't know if the number is fair, what should be included, or what it means that it landed where it did. The renovation cost calculator gives you a structured estimate before the first quote arrives — broken down by room type and quality tier. When the quote lands, it arrives with context rather than shock.
  • Free — no credit card required
  • Takes 2 minutes
  • Real estimate, not a generic range
  • Covers all six renovation types

Get your free renovation cost estimate

Answer four quick questions about your renovation. Receive a real cost estimate broken down by category — before you speak to a single trade.
Use the Free Calculator →
Opens a new page. Takes 2 minutes. No credit card required.
Used by 1,000+ homeowners · All room types · Instant results

Common Questions

  • Each complete system includes four core files — The Renovation Blueprint (12-phase planning system), The Protection Guide (46 costly mistakes, 16 trade red flags, 12 blind spots), The Planning Toolkit (12 interactive working tools), and The Quick-Reference Card (double-sided printable A4 site reference). You also receive the Start Here Guide and free access to the Renovation Cost Calculator as bonuses. Every file is included. Nothing is sold separately.

  • Neither. The Renovation Blueprint is a complete self-managed planning system. It is not content you watch, and it is not coaching where someone advises you. It is a practical working system of documents and tools you use throughout your actual renovation — at your own pace, on your own timeline, without any sessions or schedules.

  • Yes — this was built specifically for first-time renovators. Every phase assumes you are starting from scratch. The system walks you through every decision in the right order, tells you what to ask every trade, and shows you what good work looks like before you sign off. You do not need prior experience. If you can manage people and professional accountability in a work context, you already have every skill this system requires.

  • Searching online gives you fragments — individual answers to individual questions with no system connecting them. The Renovation Blueprint gives you the complete sequence: every decision in the right order, every trade coordinated correctly, every red flag identified before it costs you. The information is not new. The system connecting it — delivered at the moment it is useful, not after the fact — is what no amount of Google research can provide.

  • The system is still valuable mid-renovation. Start with the phase that corresponds to where you currently are. The Protection Guide and Planning Toolkit are useful at any stage. The Quick-Reference Card is particularly valuable once you are on site.

  • We offer a 30-day money back guarantee on all products. If you have used the system and do not find it valuable, email hello@propertyblueprintco.com within 30 days of purchase and we will refund you in full. No conditions. No forms. No questions beyond what would help us improve.