{"product_id":"full-home-renovation-blueprint-uk","title":"The Full Home Renovation Blueprint – UK Edition","description":"\u003cscript type=\"application\/ld+json\"\u003e{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Do I need planning permission for a whole-home renovation in the UK?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"It depends on scope. Like-for-like internal work — new kitchens, bathrooms and finishes in the same layout — is often outside planning control altogether, though Building Regulations may still apply. Approval is generally triggered when you remove structural walls, extend, relocate plumbing or drainage, or change the building's footprint — and at whole-home scale most projects touch at least one trigger. Phase 4 of the Blueprint shows you exactly which side of the line each part of your project sits on, nation by nation — pick yours in Nation Watch and it loads the approval route, building-control body and technical standards — and which certificates to collect before final payment.\"}},{\"@type\":\"Question\",\"name\":\"When does a whole-home renovation need a written building contract?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"At whole-home scale, virtually always. The UK has no licensing system or statutory contract threshold for builders — which is exactly why the written contract is your protection layer: a JCT Home Owner contract (or equivalent) plus your rights under the Consumer Rights Act 2015. The Blueprint walks you through what must be in that contract, and the Protection Guide flags the trade who won't put a six-figure job in writing as the red flag it is.\"}},{\"@type\":\"Question\",\"name\":\"Should we live in the home during the renovation, or move out?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"It's one of the most expensive decisions on the project, and the Blueprint treats it that way. Phase 7 puts every option side by side — staying with family, a short-term rental, a caravan on site, or living in the home through staged works — with real costs, extension risk and when each one actually works. You lock the decision before demolition day, not during it.\"}},{\"@type\":\"Question\",\"name\":\"Can I manage fifteen trades myself, or do I need a builder?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Both paths are built in. Run the project yourself — the Blueprint covers your CDM client duties and building-control routes nation by nation — or engage a builder and use the system to stay in control of quotes, variations, payments and quality. Either way, you know what should be happening in every room, in what order, and what to ask when it isn't.\"}},{\"@type\":\"Question\",\"name\":\"I have no renovation experience. Will it work for me?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. It's built for homeowners taking on a whole-home renovation for the first time — or who've renovated before and learned the hard way what they didn't know. No building knowledge is assumed: every phase is in plain language, every action is specific, and every tool is pre-populated so you're never staring at a blank screen.\"}},{\"@type\":\"Question\",\"name\":\"My renovation has already started. Is it too late?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No — but the earlier the better. At the quoting or contracting stage you get the most from the 12 phases in sequence. If you're already mid-build, open the Planning Toolkit immediately — the Variation Log, Site Diary and Payment Tracker are useful from day one, the build-sequence sheet tells you instantly whether your trades are in the right order, and the Protection Guide is relevant at any point.\"}},{\"@type\":\"Question\",\"name\":\"Is this a PDF or e-book?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. All four modules are interactive guides that open in any browser on any device — the Blueprint tracks your 168 decision points as you go, the Planning Toolkit saves your figures as you work, and everything runs completely offline with nothing to install and no account. It's a working system you use for the length of the renovation, not a static document you read once.\"}},{\"@type\":\"Question\",\"name\":\"Is it really worth £247?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Put it against the alternatives. A project manager runs 8–12% of build cost — £12,000 to £70,000-plus on a typical whole home. A quantity surveyor's cost plan alone is £1,500 to £3,000. The Blueprint is £247 — less than half of one per cent of a typical whole-home budget — and it only has to stop one of the 40 documented mistakes, once, to have paid for itself many times over. One payment, kept for every renovation after this one.\"}},{\"@type\":\"Question\",\"name\":\"I already own one of the room Blueprints. How is this different?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The room Blueprints go deep on a single room renovated as its own project. The Full Home Blueprint is built for the different, harder problem: many rooms renovated as one build — one budget, one programme, fifteen trades moving through the whole house in a 21-step sequence, and decisions in one room that change what happens in the next. If you're renovating one room at a time, the room Blueprints are the right tool. If it's one project across the home, this is.\"}},{\"@type\":\"Question\",\"name\":\"Is there support if I get stuck?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes — personal email support. Email us with any question about your renovation and you'll hear back from a real person who knows the system. Not a chatbot, not a ticket queue.\"}}]}\u003c\/script\u003e\n\u003c!--PBC-PRODUCT-V12 UK-FULLHOME 2026-07-08--\u003e\n\u003cstyle\u003e\n@import url('https:\/\/fonts.googleapis.com\/css2?family=Playfair+Display:ital,wght@0,500;0,600;1,500\u0026family=Jost:wght@400;500;600\u0026display=swap');\n.pbx2{--navy:#1B2B4B;--navy-deep:#11203f;--gold:#C9A86A;--gold-deep:#a9863f;--cream:#F7F4EE;--mediabg:#efe9dd;--ink:#3a3a38;font-family:'Jost','Helvetica Neue',Arial,sans-serif;color:var(--ink);line-height:1.6;font-size:16px;-webkit-font-smoothing:antialiased;overflow-x:hidden;}\n.pbx2 *{box-sizing:border-box;margin:0;padding:0;}\n.pbx2 .serif{font-family:'Playfair Display',Georgia,serif;font-weight:500;}\n.pbx2 img{max-width:100%;display:block;}\n.pbx2,.pbx2 *{text-align:left !important;}\n.pbx2 .ctr,.pbx2 .ctr *,.pbx2 .mstats .c,.pbx2 .mstats .c *,.pbx2 .cap,.pbx2 .del .d,.pbx2 .del .d *{text-align:center !important;}\n.pbx2 .ctr-r{text-align:right !important;}\n.pbx-bleed{width:100vw;position:relative;left:50%;margin-left:-50vw;}\n.pbx2 .sec{max-width:1340px;margin:0 auto;padding:68px 34px;}\n.pbx2 .sec-n{max-width:1120px;margin:0 auto;padding:68px 34px;}\n.pbx2 .nav{background:var(--navy);color:#fff;}.pbx2 .navd{background:var(--navy-deep);color:#fff;}\n.pbx2 .crm{background:var(--cream);}.pbx2 .wht{background:#fff;}.pbx2 .gld{background:var(--gold);}\n.pbx2 .eb{display:inline-block;font-size:10.5px;letter-spacing:.2em;text-transform:uppercase;color:var(--gold-deep);margin-bottom:14px;}\n.pbx2 .nav .eb,.pbx2 .navd .eb{color:var(--gold);}.pbx2 .gld .eb{color:#5a4a1e;}\n.pbx2 h2.h{font-size:32px;line-height:1.18;color:var(--navy);margin-bottom:14px;letter-spacing:-.01em;}\n.pbx2 .nav h2.h,.pbx2 .navd h2.h{color:#fff;}.pbx2 .gld h2.h{color:var(--navy);}\n.pbx2 .rule{width:48px;height:3px;background:var(--gold);border-radius:2px;margin:0 0 22px;}\n.pbx2 p.b{font-size:16px;line-height:1.78;margin-bottom:16px;color:#4a4a46;}\n.pbx2 .nav p.b,.pbx2 .navd p.b{color:#cdd4e2;}.pbx2 .gld p.b{color:#46371a;}\n.pbx2 .lede{font-size:18px;line-height:1.62;color:#cdd4e2;margin-bottom:22px;max-width:680px;}\n.pbx2 .ctr .lede,.pbx2 .ctr h2.h{margin-left:auto;margin-right:auto;}\n.pbx2 .chips{display:flex;flex-wrap:wrap;gap:10px;margin-top:12px;}\n.pbx2 .ctr .chips{justify-content:center;}\n.pbx2 .chip{display:flex;align-items:baseline;gap:7px;background:rgba(255,255,255,.06);border:1px solid rgba(255,255,255,.16);border-radius:8px;padding:10px 16px;}\n.pbx2 .chip b{font-family:'Playfair Display',serif;font-size:21px;color:#e0c489;}.pbx2 .chip span{font-size:10px;font-weight:600;letter-spacing:.08em;text-transform:uppercase;color:rgba(255,255,255,.72);}\n.pbx2 .stars{color:var(--gold);font-size:14px;letter-spacing:.08em;margin-top:22px;}\n.pbx2 .marq{background:var(--gold);overflow:hidden;white-space:nowrap;padding:13px 0;}\n.pbx2 .marq-track{display:flex;width:max-content;animation:pbcmarq 50s linear infinite;}\n.pbx2 .marq-g{display:flex;align-items:center;font-size:13px;color:var(--navy);font-weight:500;letter-spacing:.03em;}\n.pbx2 .marq .sp{color:#5a4a1e;padding:0 16px;}\n@keyframes pbcmarq{from{transform:translateX(0)}to{transform:translateX(-50%)}}\n.pbx2 .glance{background:var(--navy);border:1px solid #2c4063;border-top:3px solid var(--gold);border-radius:14px;padding:38px 44px;box-shadow:0 22px 56px rgba(17,29,48,.18);max-width:1120px;margin:0 auto;}\n.pbx2 .glance h3{font-family:'Playfair Display',serif;font-weight:500;font-size:24px;color:#fff;margin-bottom:12px;}\n.pbx2 .glance p{font-size:16.5px;line-height:1.74;color:#cdd4e2;}\n.pbx2 .pills{display:flex;flex-wrap:wrap;gap:9px;margin-top:20px;}\n.pbx2 .pill{font-size:11.5px;color:#e0c489;border:1px solid #43597f;border-radius:999px;padding:7px 15px;}\n.pbx2 .pill b{color:#fff;font-weight:600;}\n.pbx2 .statrow{display:grid;grid-template-columns:1fr 1fr;gap:18px;margin-top:26px;}\n.pbx2 .stat{background:var(--gold);border:1px solid #bfa05f;border-radius:14px;padding:28px 30px;box-shadow:0 14px 38px rgba(201,168,106,.22);}\n.pbx2 .stat .n{font-family:'Playfair Display',serif;font-size:52px;color:var(--navy);line-height:1;display:block;margin-bottom:12px;}\n.pbx2 .stat .t{font-size:15px;color:#46371a;line-height:1.5;}\n.pbx2 .stat .s{font-size:10px;color:#7a5f24;letter-spacing:.06em;text-transform:uppercase;margin-top:12px;display:block;}\n.pbx2 .ledger{max-width:1060px;margin:26px auto 0;border:1px solid #e8e2d6;border-radius:14px;overflow:hidden;box-shadow:0 14px 40px rgba(27,43,75,.06);}\n.pbx2 .lrow{display:flex;justify-content:space-between;align-items:center;gap:20px;padding:17px 24px;border-bottom:1px solid #efe7d8;background:#fff;}\n.pbx2 .lrow .ld{font-size:14.5px;color:#4a4a46;line-height:1.45;}\n.pbx2 .lchip{font-size:13px;font-weight:600;color:#8B2020;background:#FBEEEA;border-radius:999px;padding:6px 14px;white-space:nowrap;}\n.pbx2 .lprice{display:flex;justify-content:space-between;align-items:center;gap:20px;padding:22px 24px;background:var(--gold);}\n.pbx2 .lprice .pl{font-size:16.5px;font-weight:600;color:var(--navy);}\n.pbx2 .lprice .pv{font-family:'Playfair Display',serif;font-size:32px;color:var(--navy);}\n.pbx2 .note{font-size:14px;font-style:italic;color:#6b6760;margin-top:16px;}\n.pbx2 .nav .note{color:#9fb0c8;}\n.pbx2 .ragg{display:flex;align-items:center;justify-content:center;gap:18px;margin-bottom:8px;}\n.pbx2 .ragg .num{font-family:'Playfair Display',serif;font-size:58px;color:#fff;line-height:1;}\n.pbx2 .ragg .rs{color:var(--gold);font-size:22px;letter-spacing:3px;}\n.pbx2 .ragg .sub{font-size:13px;color:#cdd4e2;margin-top:5px;}\n.pbx2 .ragg .sub b{color:#e0c489;}\n.pbx2 .revmarq{overflow:hidden;padding:24px 0 8px;}\n.pbx2 .revmarq-track{display:flex;width:max-content;animation:pbcrev 78s linear infinite;}\n.pbx2 .revmarq:hover .revmarq-track{animation-play-state:paused;}\n.pbx2 .rev-set{display:flex;flex:0 0 auto;}\n.pbx2 .rv{flex:0 0 340px;width:340px;margin-right:16px;border:1px solid rgba(201,168,106,.28);border-radius:12px;padding:24px;background:rgba(255,255,255,.05);display:flex;flex-direction:column;}\n.pbx2 .rv .rs{color:var(--gold);font-size:15px;letter-spacing:2px;margin-bottom:12px;}\n.pbx2 .rv .q{font-family:'Playfair Display',serif;font-size:16px;color:#fff;line-height:1.5;}\n.pbx2 .rv .a{font-size:11.5px;color:#e0c489;margin-top:auto;padding-top:14px;letter-spacing:.04em;text-transform:uppercase;}\n@keyframes pbcrev{from{transform:translateX(0)}to{transform:translateX(-50%)}}\n.pbx2 .revall{margin-top:22px;}\n.pbx2 .revall a{color:#fff;font-weight:500;font-size:14px;border-bottom:2px solid var(--gold);padding-bottom:3px;text-decoration:none;}\n@media (prefers-reduced-motion:reduce){.pbx2 .marq-track,.pbx2 .revmarq-track{animation:none;}.pbx2 .revmarq-track{flex-wrap:wrap;justify-content:center;width:auto;}.pbx2 .rev-set:nth-child(2){display:none;}}\n.pbx2 .cred{font-size:14px;font-style:italic;color:var(--gold-deep);max-width:660px;margin:14px auto 0;line-height:1.5;}\n.pbx2 .modov{display:grid;grid-template-columns:repeat(4,1fr);gap:16px;margin-top:30px;}\n.pbx2 .mc{background:#fff;border-radius:12px;border-top:3px solid var(--navy);padding:24px 20px;box-shadow:0 10px 30px rgba(27,43,75,.05);}\n.pbx2 .mc .e{font-size:10px;letter-spacing:.14em;text-transform:uppercase;color:var(--gold-deep);font-weight:600;margin-bottom:10px;}\n.pbx2 .mc h4{font-family:'Playfair Display',serif;font-weight:500;font-size:18px;color:var(--navy);margin-bottom:9px;line-height:1.25;}\n.pbx2 .mc p{font-size:13px;color:#6b6760;line-height:1.55;}\n.pbx2 .row{display:grid;grid-template-columns:0.85fr 1.15fr;align-items:stretch;}\n.pbx2 .row.rev2{grid-template-columns:1.15fr 0.85fr;}\n.pbx2 .rmedia{background:var(--mediabg);display:flex;align-items:center;justify-content:center;padding:46px 38px;}\n.pbx2 .row.rev2 .rmedia{order:2;}\n.pbx2 .fwrap{position:relative;width:100%;max-width:430px;}\n.pbx2 .fwrap::before{content:\"\";position:absolute;left:-22px;right:24px;top:26px;bottom:-22px;border-radius:16px;background:linear-gradient(135deg,rgba(201,168,106,.26),rgba(27,43,75,.12));z-index:0;}\n.pbx2 .row.rev2 .fwrap::before{left:24px;right:-22px;background:linear-gradient(225deg,rgba(201,168,106,.26),rgba(27,43,75,.12));}\n.pbx2 .frame{position:relative;z-index:1;border-radius:10px;overflow:hidden;background:#fff;border:1px solid #e6e1d8;box-shadow:0 22px 54px rgba(17,29,48,.24);}\n.pbx2 .fbar{display:flex;align-items:center;gap:7px;padding:10px 13px;background:#eceae4;border-bottom:1px solid #ddd9d0;}\n.pbx2 .fbar i{width:10px;height:10px;border-radius:50%;background:#c9c5bb;display:inline-block;}\n.pbx2 .fbar i:nth-child(1){background:#e08b7e;}.pbx2 .fbar i:nth-child(2){background:#e4c07a;}.pbx2 .fbar i:nth-child(3){background:#9ec089;}\n.pbx2 .fbar .u{flex:1;margin-left:8px;background:#fff;border-radius:5px;font-size:10px;color:#9a958a;padding:4px 10px;}\n.pbx2 .frame img{width:100%;display:block;}\n.pbx2 .cap{position:relative;z-index:2;font-size:10.5px;font-weight:600;letter-spacing:.1em;text-transform:uppercase;color:#9a958a;margin-top:13px;}\n.pbx2 .mtext{padding:54px 56px;display:flex;flex-direction:column;justify-content:center;}\n.pbx2 .mtitle{font-family:'Playfair Display',serif;font-weight:500;font-size:28px;line-height:1.18;margin-bottom:6px;}\n.pbx2 .nav .mtitle{color:#fff;}.pbx2 .gld .mtitle{color:var(--navy);}\n.pbx2 .promise{font-family:'Playfair Display',serif;font-style:italic;font-size:18.5px;line-height:1.4;margin-bottom:14px;}\n.pbx2 .nav .promise{color:#e0c489;}.pbx2 .gld .promise{color:#7a5f24;}\n.pbx2 .phases{display:grid;grid-template-columns:1fr 1fr;gap:1px;background:rgba(120,110,90,.22);border-radius:8px;overflow:hidden;margin-top:6px;}\n.pbx2 .phases div{background:#fff;padding:8px 11px 8px 33px;position:relative;font-size:13px;color:var(--navy);line-height:1.25;}\n.pbx2 .phases .n{position:absolute;left:12px;top:8px;font-size:10px;font-weight:600;color:var(--gold-deep);}\n.pbx2 .mstats{display:grid;grid-template-columns:repeat(3,1fr);gap:2px;background:var(--gold);border-radius:6px;overflow:hidden;margin-top:6px;}\n.pbx2 .mstats .c{background:var(--navy);padding:18px 8px;}\n.pbx2 .mstats .v{font-family:'Playfair Display',serif;font-size:36px;color:var(--gold);line-height:1;display:block;margin-bottom:4px;}\n.pbx2 .mstats .k{font-size:10px;letter-spacing:.08em;text-transform:uppercase;color:rgba(255,255,255,.66);}\n.pbx2 .tg{display:grid;grid-template-columns:1fr 1fr;gap:11px;margin-top:6px;counter-reset:tt;}\n.pbx2 .tg .c{background:#fff;border:1px solid #e2ddd5;border-radius:8px;padding:14px 16px;}\n.pbx2 .tg .c.b{border-top:3px solid var(--gold);}.pbx2 .tg .c.n{border-top:3px solid var(--navy);}.pbx2 .tg .c.s{border-top:3px solid #7d8f6e;}.pbx2 .tg .c.k{border-top:3px solid #a8624f;}\n.pbx2 .tg h5{font-size:11px;letter-spacing:.1em;text-transform:uppercase;color:var(--navy);margin-bottom:4px;}\n.pbx2 .tg .gd{font-size:11.5px;color:#8a8478;font-style:italic;margin-bottom:8px;line-height:1.3;}\n.pbx2 .tg ul{list-style:none;}\n.pbx2 .tg li{font-size:13px;color:#2a2a2a;padding:4px 0 4px 23px;position:relative;counter-increment:tt;line-height:1.35;}\n.pbx2 .tg li::before{content:counter(tt,decimal-leading-zero);position:absolute;left:0;color:var(--gold-deep);font-weight:600;font-size:10px;}\n.pbx2 .sheets{display:grid;grid-template-columns:1fr;gap:7px;margin-top:6px;}\n.pbx2 .sh{display:flex;gap:12px;background:#fff;border:1px solid #e2ddd5;border-left:3px solid var(--gold);border-radius:0 6px 6px 0;padding:11px 15px;}\n.pbx2 .sh .pg{font-size:10px;font-weight:600;color:var(--gold-deep);padding-top:2px;white-space:nowrap;}\n.pbx2 .sh .st{font-family:'Playfair Display',serif;font-size:14.5px;color:var(--navy);margin-bottom:1px;}\n.pbx2 .sh .sd{font-size:12px;color:#6b6760;line-height:1.35;}\n.pbx2 .prevent{background:#FBF7EF;border-left:3px solid var(--gold);border-radius:0 6px 6px 0;padding:14px 18px;margin-top:16px;}\n.pbx2 .prevent b{font-size:10px;letter-spacing:.1em;text-transform:uppercase;color:#9a7b3f;display:block;margin-bottom:4px;}\n.pbx2 .prevent p{font-size:13.5px;font-style:italic;color:#2a2a2a;line-height:1.55;}\n.pbx2 .ctab{border:1px solid #e6dcc9;border-radius:12px;overflow:hidden;margin-top:8px;box-shadow:0 14px 40px rgba(27,43,75,.06);}\n.pbx2 .chead{display:grid;grid-template-columns:1fr 1fr 1fr;}\n.pbx2 .chead\u003ediv{padding:15px 18px;font-size:10.5px;font-weight:600;letter-spacing:.1em;text-transform:uppercase;}\n.pbx2 .chead .l{background:var(--navy);color:var(--gold);}.pbx2 .chead .ba{background:var(--cream);color:#6b6760;}.pbx2 .chead .go{background:var(--gold);color:var(--navy);}\n.pbx2 .crow{display:grid;grid-template-columns:1fr 1fr 1fr;border-top:1px solid #efe7d8;}\n.pbx2 .crow .dim{padding:15px 18px;background:var(--navy);display:flex;flex-direction:column;justify-content:center;}\n.pbx2 .crow .dim strong{color:#fff;font-size:14px;}\n.pbx2 .crow .dim .dsc{font-size:11.5px;color:#a9b6cb;margin-top:3px;line-height:1.3;}\n.pbx2 .crow .ba,.pbx2 .crow .go{padding:15px 18px;font-size:13.5px;display:flex;gap:9px;align-items:flex-start;line-height:1.42;}\n.pbx2 .crow .ba{background:var(--cream);color:#6b6760;}\n.pbx2 .crow .ba i{color:#9aa1ad;font-style:normal;flex-shrink:0;}.pbx2 .crow .ba strong{display:block;color:#56524c;margin-bottom:2px;}\n.pbx2 .crow .go{background:var(--gold);color:var(--navy);}\n.pbx2 .crow .go i{color:var(--navy);font-style:normal;font-weight:700;flex-shrink:0;}.pbx2 .crow .go strong{display:block;margin-bottom:2px;}\n.pbx2 .au{display:grid;grid-template-columns:1fr 1fr;gap:16px;margin-top:22px;}\n.pbx2 .au .c{background:#fff;border:1px solid #e6dcc9;border-top:3px solid var(--gold);border-radius:12px;padding:24px 22px;box-shadow:0 16px 38px rgba(8,16,32,.24);}\n.pbx2 .au .c h4{font-family:'Playfair Display',serif;font-weight:500;font-size:17px;color:var(--navy);margin-bottom:8px;}\n.pbx2 .au .c p{font-size:13.5px;color:#5a5650;line-height:1.55;}\n.pbx2 .quote{max-width:1000px;margin:0 auto;}\n.pbx2 .quote p{font-family:'Playfair Display',serif;font-style:italic;font-size:23px;color:var(--navy);line-height:1.55;}\n.pbx2 .quote .by{font-size:12.5px;color:var(--gold-deep);letter-spacing:.05em;text-transform:uppercase;margin-top:18px;}\n.pbx2 .qlead{font-size:16px;line-height:1.72;color:#4a4a46;max-width:760px;margin:0 auto 26px;}\n.pbx2 .who{display:grid;grid-template-columns:1fr 1fr;gap:20px;margin-top:24px;}\n.pbx2 .who .c{border:1px solid #e8e2d6;border-radius:14px;padding:30px;background:#fff;box-shadow:0 12px 34px rgba(27,43,75,.05);}\n.pbx2 .who .c.g{border-top:3px solid var(--gold);}.pbx2 .who .c.n{border-top:3px solid var(--navy);}\n.pbx2 .who h4{font-family:'Playfair Display',serif;font-weight:500;font-size:19px;color:var(--navy);margin-bottom:16px;}\n.pbx2 .who ul{list-style:none;}\n.pbx2 .who li{font-size:14px;color:#4a4a46;padding:10px 0 10px 28px;border-bottom:1px solid #efe7d8;position:relative;line-height:1.5;}\n.pbx2 .who li:last-child{border-bottom:none;}\n.pbx2 .who .g li::before{content:\"\\2713\";position:absolute;left:0;top:10px;color:var(--gold-deep);font-weight:700;font-size:13px;}\n.pbx2 .who .n li::before{content:\"\\2014\";position:absolute;left:0;top:10px;color:#b3ada2;font-weight:700;}\n.pbx2 .offer{background:#fff;border:1px solid #e8e2d6;border-top:3px solid var(--gold);border-radius:14px;padding:42px 48px;max-width:860px;margin:0 auto;box-shadow:0 22px 56px rgba(17,29,48,.1);}\n.pbx2 .offer h3{font-family:'Playfair Display',serif;font-weight:500;font-size:25px;color:var(--navy);margin-bottom:5px;}\n.pbx2 .offer .os{font-size:15px;color:#6b6760;margin-bottom:22px;}\n.pbx2 .offer ul{list-style:none;}\n.pbx2 .offer li{display:flex;justify-content:space-between;gap:16px;align-items:center;padding:13px 0;border-bottom:1px solid #efe7d8;}\n.pbx2 .offer li .l{font-size:15.5px;color:#3a3a38;}.pbx2 .offer li .l b{color:var(--navy);font-weight:600;}.pbx2 .offer li .l span{display:block;font-size:12.5px;color:#6b6760;font-style:italic;margin-top:1px;}\n.pbx2 .offer li .v{font-size:10.5px;font-weight:600;letter-spacing:.04em;text-transform:uppercase;color:var(--gold-deep);background:#F4ECDB;border-radius:999px;padding:5px 12px;white-space:nowrap;}\n.pbx2 .offer .price{display:flex;justify-content:space-between;align-items:center;padding:20px 22px;background:#FBF6EC;border:1px solid #ecdcbb;border-radius:12px;margin-top:18px;}\n.pbx2 .offer .price .pe{font-size:10.5px;letter-spacing:.14em;text-transform:uppercase;color:var(--gold-deep);}.pbx2 .offer .price .pe span{display:block;font-size:12px;letter-spacing:0;text-transform:none;color:#6b6760;font-style:italic;margin-top:3px;}\n.pbx2 .offer .price .pn{font-family:'Playfair Display',serif;font-size:34px;color:var(--navy);}\n.pbx2 .del{display:grid;grid-template-columns:repeat(3,1fr);gap:26px;margin-top:12px;}\n.pbx2 .dico{width:54px;height:54px;border-radius:50%;background:rgba(201,168,106,.16);border:1px solid rgba(201,168,106,.5);display:flex;align-items:center;justify-content:center;margin:0 auto 16px;}\n.pbx2 .dico svg{width:24px;height:24px;stroke:var(--gold);fill:none;stroke-width:1.6;}\n.pbx2 .del .dt{font-family:'Playfair Display',serif;font-size:17px;color:#fff;margin-bottom:8px;}\n.pbx2 .del .db{font-size:13.5px;color:#cdd4e2;line-height:1.55;}\n.pbx2 .reassure{font-size:12px;letter-spacing:.07em;text-transform:uppercase;color:#9fb0c8;margin-top:30px;}\n.pbx2 .gld .dico{background:rgba(27,43,75,.1);border-color:rgba(27,43,75,.42);}\n.pbx2 .gld .dico svg{stroke:var(--navy);}\n.pbx2 .gld .reassure{color:#5a4a1e;}\n.pbx2 .gld .rule{background:var(--navy);}\n.pbx2 .faq{max-width:920px;margin:0 auto;}\n.pbx2 .faq details{border-bottom:1px solid #e6dcc9;}\n.pbx2 .faq summary{list-style:none;cursor:pointer;padding:19px 0;font-size:17px;font-weight:500;color:var(--navy);display:flex;justify-content:space-between;gap:16px;align-items:center;}\n.pbx2 .faq summary::-webkit-details-marker{display:none;}\n.pbx2 .faq summary::after{content:\"\\25BE\";color:var(--gold);font-size:13px;transition:transform .2s;display:inline-block;flex-shrink:0;}\n.pbx2 .faq details[open] summary::after{transform:rotate(180deg);}\n.pbx2 .faq .ans{font-size:15px;color:#5a5650;line-height:1.75;padding:0 0 19px;}\n.pbx2 .fork{display:grid;grid-template-columns:1fr 1fr;gap:18px;margin-top:12px;}\n.pbx2 .fork .c{padding:30px 32px;border-radius:14px;}\n.pbx2 .fork .bad{background:rgba(255,255,255,.04);border:1px solid rgba(255,255,255,.1);}\n.pbx2 .fork .good{background:rgba(201,168,106,.12);border:1px solid rgba(201,168,106,.4);}\n.pbx2 .fork .fl{font-size:10.5px;font-weight:600;letter-spacing:.14em;text-transform:uppercase;color:rgba(255,255,255,.5);margin-bottom:12px;}\n.pbx2 .fork .good .fl{color:var(--gold);}\n.pbx2 .fork p{font-size:15px;line-height:1.72;color:rgba(255,255,255,.82);}\n.pbx2 .closing{font-size:14px;color:#cdd4e2;margin-top:26px;font-style:italic;}\n@media(max-width:849px){\n.pbx2 .row,.pbx2 .row.rev2{grid-template-columns:1fr;}.pbx2 .row.rev2 .rmedia{order:0;}\n.pbx2 .mtext{padding:38px 30px;}.pbx2 .rmedia{padding:34px 26px;}.pbx2 .fwrap::before{display:none;}\n.pbx2 .modov{grid-template-columns:1fr 1fr;}\n.pbx2 h2.h{font-size:27px;}.pbx2 .sec,.pbx2 .sec-n{padding:50px 26px;}\n}\n@media(max-width:560px){\n.pbx2 .statrow,.pbx2 .who,.pbx2 .au,.pbx2 .fork,.pbx2 .del,.pbx2 .modov,.pbx2 .phases,.pbx2 .tg,.pbx2 .mstats{grid-template-columns:1fr;}\n.pbx2 .chead{display:none;}.pbx2 .crow{grid-template-columns:1fr;}\n.pbx2 .lrow{flex-direction:column;align-items:flex-start;gap:8px;}\n.pbx2 .offer{padding:28px 24px;}.pbx2 .glance{padding:26px 24px;}\n}\n.pbx2 .serif,.pbx2 .glance h3,.pbx2 .stat .n,.pbx2 .mtitle,.pbx2 .promise,.pbx2 .mstats .v,.pbx2 .sh .st,.pbx2 .mc h4,.pbx2 .rv .q,.pbx2 .quote p,.pbx2 .au .c h4,.pbx2 .who h4{font-family:'Playfair Display',Georgia,serif !important;}\n\u003c\/style\u003e\n\u003cdiv class=\"pbx2\"\u003e\n\n\u003c!-- ===== TRUST MARQUEE ===== --\u003e\n\u003cdiv class=\"pbx-bleed marq\"\u003e\u003cdiv class=\"marq-track\"\u003e\n\u003cdiv class=\"marq-g\"\u003e\n\u003cspan\u003e★ 4.9 from verified homeowners\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\u003cspan\u003eInstant download\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\u003cspan\u003eLifetime access\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\u003cspan\u003e30-day money-back guarantee\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\u003cspan\u003eNo subscription\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\u003cspan\u003eWorks offline\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"marq-g\" aria-hidden=\"true\"\u003e\n\u003cspan\u003e★ 4.9 from verified homeowners\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\u003cspan\u003eInstant download\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\u003cspan\u003eLifetime access\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\u003cspan\u003e30-day money-back guarantee\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\u003cspan\u003eNo subscription\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\u003cspan\u003eWorks offline\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"marq-g\" aria-hidden=\"true\"\u003e\n\u003cspan\u003e★ 4.9 from verified homeowners\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\u003cspan\u003eInstant download\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\u003cspan\u003eLifetime access\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\u003cspan\u003e30-day money-back guarantee\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\u003cspan\u003eNo subscription\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\u003cspan\u003eWorks offline\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"marq-g\" aria-hidden=\"true\"\u003e\n\u003cspan\u003e★ 4.9 from verified homeowners\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\u003cspan\u003eInstant download\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\u003cspan\u003eLifetime access\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\u003cspan\u003e30-day money-back guarantee\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\u003cspan\u003eNo subscription\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\u003cspan\u003eWorks offline\u003c\/span\u003e\u003cspan class=\"sp\"\u003e·\u003c\/span\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\u003c\/div\u003e\n\n\u003c!-- ===== VALUE BAND ===== --\u003e\n\u003cdiv class=\"pbx-bleed nav\"\u003e\u003cdiv class=\"sec ctr\"\u003e\n\u003cspan class=\"eb\"\u003eBuilt on The 12 Phase System™ · United Kingdom Full Home Edition\u003c\/span\u003e\n\u003ch2 class=\"h serif\" style=\"max-width:36ch;\"\u003eFifteen trades will move through your home. Every one of them has a system. This is yours.\u003c\/h2\u003e\n\u003cp class=\"lede\" style=\"max-width:940px;\"\u003eRight now you have a number you're hoping holds, a list of rooms, and a decision you haven't been able to settle — live in or move out, builder or run it yourself, everything at once or one stage at a time. What you don't have is a way to know whether the quotes are comparable, whether the trades are in the right order, or whether the variation you're asked to approve mid-build is real. The 12 Phase System closes that gap at whole-home scale — from strategy and budget to the day you hold every certificate and the last defect is fixed.\u003c\/p\u003e\n\u003cdiv class=\"chips\"\u003e\n\u003cdiv class=\"chip\"\u003e\n\u003cb\u003e12\u003c\/b\u003e\u003cspan\u003ePhases\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"chip\"\u003e\n\u003cb\u003e168\u003c\/b\u003e\u003cspan\u003eDecision points\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"chip\"\u003e\n\u003cb\u003e15\u003c\/b\u003e\u003cspan\u003eTrades coordinated\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"chip\"\u003e\n\u003cb\u003e40\u003c\/b\u003e\u003cspan\u003eCostly mistakes\u003c\/span\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"stars\"\u003e★★★★★  4.9 from verified homeowners\u003c\/div\u003e\n\u003c\/div\u003e\u003c\/div\u003e\n\n\u003c!-- ===== AT A GLANCE ===== --\u003e\n\u003cdiv class=\"pbx-bleed crm\"\u003e\u003cdiv class=\"sec\"\u003e\n\u003cdiv class=\"glance\"\u003e\n\u003ch3 class=\"serif\"\u003eWhat is the Full Home Renovation Blueprint?\u003c\/h3\u003e\n\u003cp\u003eIt's the complete planning system for a whole-home renovation in the UK — 12 phases, 168 decision points, every cost and the exact questions to ask, from first strategy session to final handover. It coordinates the fifteen trades that pass through a full renovation in their correct 21-step sequence, so decisions in one room never blindside the next. Four interactive modules — the Blueprint, the Protection Guide, the Planning Toolkit and the On-Site Handbook — plus a Renovation Cost Calculator, included free. Yours permanently, whether you manage the build yourself or run a builder with confidence.\u003c\/p\u003e\n\u003cdiv class=\"pills\"\u003e\n\u003cspan class=\"pill\"\u003e\u003cb\u003eFormat:\u003c\/b\u003e Interactive, works offline\u003c\/span\u003e\u003cspan class=\"pill\"\u003e\u003cb\u003eFor:\u003c\/b\u003e UK homeowners \u0026amp; investors · whole-home \u0026amp; multi-room projects\u003c\/span\u003e\u003cspan class=\"pill\"\u003e\u003cb\u003eDelivery:\u003c\/b\u003e Instant download\u003c\/span\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\u003c\/div\u003e\n\n\u003c!-- ===== REALITY ===== --\u003e\n\u003cdiv class=\"pbx-bleed nav\"\u003e\u003cdiv class=\"sec-n\"\u003e\n\u003cspan class=\"eb\"\u003eThe UK whole-home reality\u003c\/span\u003e\n\u003ch2 class=\"h serif\"\u003eWhy do most whole-home renovations cost more than the quote?\u003c\/h2\u003e\n\u003cdiv class=\"rule\"\u003e\u003c\/div\u003e\n\u003cp class=\"b\"\u003eBecause the most expensive decisions are made before a single trade picks up a tool — and at whole-home scale, every one of them is multiplied across rooms. The builder has a sequence. Each trade has a process. You have a mood board, a spreadsheet, and a number you're hoping holds. It rarely does: more than a third of UK homeowners go over budget, and a quarter start with no budget at all. On a single room that's painful. Across a whole home — fifteen trades, twenty-one steps, months on site — it's the difference between finishing the project and pausing it half-done.\u003c\/p\u003e\n\u003cdiv class=\"statrow\"\u003e\n\u003cdiv class=\"stat\"\u003e\n\u003cspan class=\"n serif\"\u003e38%\u003c\/span\u003e\u003cdiv class=\"t\"\u003eof UK homeowners went over their renovation budget.\u003c\/div\u003e\n\u003cspan class=\"s\"\u003eSource: 2026 UK Houzz \u0026amp; Home Renovation Trends Report\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"stat\"\u003e\n\u003cspan class=\"n serif\"\u003e26%\u003c\/span\u003e\u003cdiv class=\"t\"\u003estarted their renovation with no budget at all.\u003c\/div\u003e\n\u003cspan class=\"s\"\u003eSource: 2026 UK Houzz \u0026amp; Home Renovation Trends Report\u003c\/span\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cp class=\"b\" style=\"font-style:italic;color:#e0c489;margin-top:20px;\"\u003eA tiler booked before the waterproofer has finished. A variation approved in a hallway conversation that lands as a five-figure invoice. A progress payment released the day before an inspection would have failed. None of these are bad luck — they're what happens when the only person watching the whole home doesn't have a system for it.\u003c\/p\u003e\n\u003c\/div\u003e\u003c\/div\u003e\n\n\u003c!-- ===== COST LEDGER ===== --\u003e\n\u003cdiv class=\"pbx-bleed crm\"\u003e\u003cdiv class=\"sec-n\"\u003e\n\u003cspan class=\"eb\"\u003eWhat unpreparedness costs\u003c\/span\u003e\n\u003ch2 class=\"h serif\"\u003eWhat does it cost to walk into a whole-home renovation unprepared?\u003c\/h2\u003e\n\u003cdiv class=\"rule\"\u003e\u003c\/div\u003e\n\u003cp class=\"b\"\u003eOn a UK whole-home renovation — typically £150,000 to £280,000 for a standard scope, and well past £480,000 for larger structural projects — arriving unprepared doesn't cost hundreds. Each of these is a single documented line item from the Protection Guide's forty:\u003c\/p\u003e\n\u003cdiv class=\"ledger\"\u003e\n\u003cdiv class=\"lrow\"\u003e\n\u003cspan class=\"ld\"\u003eStarting demolition before selections, permits and finance are locked\u003c\/span\u003e\u003cspan class=\"lchip\"\u003e£20,000 – £60,000\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"lrow\"\u003e\n\u003cspan class=\"ld\"\u003eTrades sequenced in the wrong order — rework and comeback fees across rooms\u003c\/span\u003e\u003cspan class=\"lchip\"\u003e£10,000 – £60,000\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"lrow\"\u003e\n\u003cspan class=\"ld\"\u003eA single verbally approved variation at whole-home scale\u003c\/span\u003e\u003cspan class=\"lchip\"\u003e£5,000 – £25,000\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"lrow\"\u003e\n\u003cspan class=\"ld\"\u003eProgress payments released ahead of the work — with no inspection hold point\u003c\/span\u003e\u003cspan class=\"lchip\"\u003e£10,000 – £50,000\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"lrow\"\u003e\n\u003cspan class=\"ld\"\u003eThe alternative: a project manager to run it for you, at 8–12% of build cost\u003c\/span\u003e\u003cspan class=\"lchip\"\u003e£12,000 – £70,000+\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"lprice\"\u003e\n\u003cspan class=\"pl\"\u003eThe Full Home Renovation Blueprint\u003c\/span\u003e\u003cspan class=\"pv serif\"\u003e£247\u003c\/span\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cp class=\"note\"\u003e£247 is less than half of one per cent of a typical whole-home budget. Stop one line on this list, once, and the Blueprint has paid for itself many times over — it protects most when you have it before you sign anything.\u003c\/p\u003e\n\u003c\/div\u003e\u003c\/div\u003e\n\n\u003c!-- ===== REVIEWS CAROUSEL ===== --\u003e\n\u003cdiv class=\"pbx-bleed navd\"\u003e\n\u003cdiv class=\"sec ctr\" style=\"padding-bottom:0;\"\u003e\n\u003cdiv class=\"ragg\"\u003e\n\u003cdiv class=\"num serif\"\u003e4.9\u003c\/div\u003e\n\u003cdiv\u003e\n\u003cdiv class=\"rs\"\u003e★★★★★\u003c\/div\u003e\n\u003cdiv class=\"sub\"\u003eout of 5 · \u003cb\u003everified homeowners\u003c\/b\u003e · reviews by Judge.me\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003ch2 class=\"h serif\" style=\"font-size:25px;margin-top:18px;\"\u003eHomeowners who ran their renovation on the Blueprint system\u003c\/h2\u003e\n\u003cp class=\"cred\" style=\"color:#9fb0c8;\"\u003eVerified reviews from Property Blueprint Co.'s room Blueprints — the Full Home edition is the same system, scaled to the whole house.\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"revmarq\"\u003e\u003cdiv class=\"revmarq-track\"\u003e\n\u003cdiv class=\"rev-set\"\u003e\n\u003cdiv class=\"rv\"\u003e\n\u003cdiv class=\"rs\"\u003e★★★★★\u003c\/div\u003e\n\u003cdiv class=\"q\"\u003e“This system prevented weeks of delays — sequencing cabinets, stone and electrics was flawless. It saved me over £12,000 in management fees.”\u003c\/div\u003e\n\u003cdiv class=\"a\"\u003eJames \u0026amp; C. · Verified homeowner\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"rv\"\u003e\n\u003cdiv class=\"rs\"\u003e★★★★★\u003c\/div\u003e\n\u003cdiv class=\"q\"\u003e“Husband was sceptical, but we did the kitchen in 6 weeks. I genuinely felt like the professional onsite.”\u003c\/div\u003e\n\u003cdiv class=\"a\"\u003eMichelle K. · Verified homeowner\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"rv\"\u003e\n\u003cdiv class=\"rs\"\u003e★★★★★\u003c\/div\u003e\n\u003cdiv class=\"q\"\u003e“We managed our cabinet maker and stone mason at once, with zero communication issues. The infrastructure that prevents mistakes.”\u003c\/div\u003e\n\u003cdiv class=\"a\"\u003eDavid P. · Verified homeowner\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"rv\"\u003e\n\u003cdiv class=\"rs\"\u003e★★★★★\u003c\/div\u003e\n\u003cdiv class=\"q\"\u003e“It's not a DIY manual — it gave me the exact script to use with the trades. No one could engineer extra costs because I had the roadmap.”\u003c\/div\u003e\n\u003cdiv class=\"a\"\u003eGideon J. · Verified homeowner\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"rv\"\u003e\n\u003cdiv class=\"rs\"\u003e★★★★★\u003c\/div\u003e\n\u003cdiv class=\"q\"\u003e“I bought it just to check if I was being ripped off. A total eye-opener — I didn't pick up a single tool, but it changed how the whole job ran.”\u003c\/div\u003e\n\u003cdiv class=\"a\"\u003eDavid S. · Verified homeowner\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"rv\"\u003e\n\u003cdiv class=\"rs\"\u003e★★★★★\u003c\/div\u003e\n\u003cdiv class=\"q\"\u003e“Every quote had a management fee tacked on for ‘coordination’ — paying for phone calls I could make myself. So glad I found this first.”\u003c\/div\u003e\n\u003cdiv class=\"a\"\u003eMegan T. · Verified homeowner\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"rev-set\" aria-hidden=\"true\"\u003e\n\u003cdiv class=\"rv\"\u003e\n\u003cdiv class=\"rs\"\u003e★★★★★\u003c\/div\u003e\n\u003cdiv class=\"q\"\u003e“This system prevented weeks of delays — sequencing cabinets, stone and electrics was flawless. It saved me over £12,000 in management fees.”\u003c\/div\u003e\n\u003cdiv class=\"a\"\u003eJames \u0026amp; C. · Verified homeowner\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"rv\"\u003e\n\u003cdiv class=\"rs\"\u003e★★★★★\u003c\/div\u003e\n\u003cdiv class=\"q\"\u003e“Husband was sceptical, but we did the kitchen in 6 weeks. I genuinely felt like the professional onsite.”\u003c\/div\u003e\n\u003cdiv class=\"a\"\u003eMichelle K. · Verified homeowner\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"rv\"\u003e\n\u003cdiv class=\"rs\"\u003e★★★★★\u003c\/div\u003e\n\u003cdiv class=\"q\"\u003e“We managed our cabinet maker and stone mason at once, with zero communication issues. The infrastructure that prevents mistakes.”\u003c\/div\u003e\n\u003cdiv class=\"a\"\u003eDavid P. · Verified homeowner\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"rv\"\u003e\n\u003cdiv class=\"rs\"\u003e★★★★★\u003c\/div\u003e\n\u003cdiv class=\"q\"\u003e“It's not a DIY manual — it gave me the exact script to use with the trades. No one could engineer extra costs because I had the roadmap.”\u003c\/div\u003e\n\u003cdiv class=\"a\"\u003eGideon J. · Verified homeowner\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"rv\"\u003e\n\u003cdiv class=\"rs\"\u003e★★★★★\u003c\/div\u003e\n\u003cdiv class=\"q\"\u003e“I bought it just to check if I was being ripped off. A total eye-opener — I didn't pick up a single tool, but it changed how the whole job ran.”\u003c\/div\u003e\n\u003cdiv class=\"a\"\u003eDavid S. · Verified homeowner\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"rv\"\u003e\n\u003cdiv class=\"rs\"\u003e★★★★★\u003c\/div\u003e\n\u003cdiv class=\"q\"\u003e“Every quote had a management fee tacked on for ‘coordination’ — paying for phone calls I could make myself. So glad I found this first.”\u003c\/div\u003e\n\u003cdiv class=\"a\"\u003eMegan T. · Verified homeowner\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\u003c\/div\u003e\n\u003cdiv class=\"sec ctr\" style=\"padding-top:0;\"\u003e\u003cdiv class=\"revall\"\u003e\u003ca href=\"\/en-gb\/pages\/reviews\"\u003eRead all reviews →\u003c\/a\u003e\u003c\/div\u003e\u003c\/div\u003e\n\u003c\/div\u003e\n\n\u003c!-- ===== WHAT'S INSIDE ===== --\u003e\n\u003cdiv class=\"pbx-bleed crm\"\u003e\u003cdiv class=\"sec ctr\"\u003e\n\u003cspan class=\"eb\"\u003eWhat's inside\u003c\/span\u003e\n\u003ch2 class=\"h serif\"\u003eWhat's inside the Full Home Blueprint?\u003c\/h2\u003e\n\u003cdiv class=\"rule\" style=\"margin-left:auto;margin-right:auto;\"\u003e\u003c\/div\u003e\n\u003cp class=\"b\" style=\"max-width:680px;margin:0 auto;\"\u003eOne system, four modules, plus the Renovation Cost Calculator — included free. The Blueprint teaches you the 12 phases; the other three hand you the tools to run them — a risk guide, a working toolkit, and an on-site handbook for your phone. The same architecture as our Kitchen and Bathroom Blueprints, scaled to the whole home.\u003c\/p\u003e\n\u003cp class=\"cred\"\u003eBuilt from years of hands-on renovation experience — every phase tested on real UK projects, not theory.\u003c\/p\u003e\n\u003cdiv class=\"modov\"\u003e\n\u003cdiv class=\"mc\"\u003e\n\u003cdiv class=\"e\"\u003eModule 1 · The Foundation\u003c\/div\u003e\n\u003ch4\u003eThe Renovation Blueprint\u003c\/h4\u003e\n\u003cp\u003eThe 12 Phase System at whole-home scale — what happens in every room, when, and what to ask. 168 decision points from strategy to handover, plus a worked example of a real whole-home renovation and a plain-English glossary.\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"mc\"\u003e\n\u003cdiv class=\"e\"\u003eModule 2 · The Risk Layer\u003c\/div\u003e\n\u003ch4\u003eThe Protection Guide\u003c\/h4\u003e\n\u003cp\u003e40 costly mistakes, 24 trade red flags and 19 blind-spot scenarios — each with a documented pound range and the exact way to avoid it.\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"mc\"\u003e\n\u003cdiv class=\"e\"\u003eModule 3 · The Working Tools\u003c\/div\u003e\n\u003ch4\u003eThe Planning Toolkit\u003c\/h4\u003e\n\u003cp\u003e12 interactive tools that keep your budget, variations, payments and certificates under control — saving automatically, working offline.\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"mc\"\u003e\n\u003cdiv class=\"e\"\u003eModule 4 · On-Site\u003c\/div\u003e\n\u003ch4\u003eThe On-Site Handbook\u003c\/h4\u003e\n\u003cp\u003e6 reference sheets — every room's measurements, the 21-step build sequence, daily checks, payments, contacts — on your phone, with or without signal.\u003c\/p\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\u003c\/div\u003e\n\n\u003c!-- ===== MODULE 1 ===== --\u003e\n\u003cdiv class=\"pbx-bleed row\"\u003e\n\u003cdiv class=\"rmedia\"\u003e\u003cdiv class=\"fwrap\"\u003e\n\u003cdiv class=\"frame\"\u003e\n\u003cdiv class=\"fbar\"\u003e\n\u003ci\u003e\u003c\/i\u003e\u003ci\u003e\u003c\/i\u003e\u003ci\u003e\u003c\/i\u003e\u003cspan class=\"u\"\u003eModule 1 — The Full Home Renovation Blueprint\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cimg src=\"https:\/\/d2ol7oe51mr4n9.cloudfront.net\/user_3C6DhjXOUbDZ61W1X68aCopcGNT\/59149b25-9d21-4b22-8d7b-c738edd28114.png\" width=\"860\" height=\"605\" alt=\"The Full Home Renovation Blueprint module 1 — the 12 Phase System for a whole-home renovation in the UK, with 168 decision points\"\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"cap\"\u003eModule 1 · The 12 Phase System — whole-home edition\u003c\/div\u003e\n\u003c\/div\u003e\u003c\/div\u003e\n\u003cdiv class=\"mtext nav\"\u003e\n\u003cspan class=\"eb\"\u003eModule 1 · The Foundation\u003c\/span\u003e\n\u003cdiv class=\"mtitle serif\"\u003eThe Renovation Blueprint\u003c\/div\u003e\n\u003cdiv class=\"rule\"\u003e\u003c\/div\u003e\n\u003cp class=\"promise\"\u003eYou walk into every site meeting knowing exactly what should be happening in every room — and exactly what to say when it isn't.\u003c\/p\u003e\n\u003cp class=\"b\"\u003eOn a whole-home project, control slips away one room at a time. The Blueprint hands it back as one system: twelve chronological phases covering the entire build, with every decision — live in or move out, staged or simultaneous, which trades, what order, what to hold back until inspection — captured at a GO \/ NO-GO checkpoint before money moves. 168 decision points, tracked as you go.\u003c\/p\u003e\n\u003cdiv class=\"phases\"\u003e\n\u003cdiv\u003e\n\u003cspan class=\"n\"\u003e01\u003c\/span\u003eStrategy\u003c\/div\u003e\n\u003cdiv\u003e\n\u003cspan class=\"n\"\u003e02\u003c\/span\u003eBudget\u003c\/div\u003e\n\u003cdiv\u003e\n\u003cspan class=\"n\"\u003e03\u003c\/span\u003eDesign\u003c\/div\u003e\n\u003cdiv\u003e\n\u003cspan class=\"n\"\u003e04\u003c\/span\u003ePermits \u0026amp; compliance\u003c\/div\u003e\n\u003cdiv\u003e\n\u003cspan class=\"n\"\u003e05\u003c\/span\u003eSelections \u0026amp; specifications\u003c\/div\u003e\n\u003cdiv\u003e\n\u003cspan class=\"n\"\u003e06\u003c\/span\u003eTrades \u0026amp; contracts\u003c\/div\u003e\n\u003cdiv\u003e\n\u003cspan class=\"n\"\u003e07\u003c\/span\u003eProgramme \u0026amp; site preparation\u003c\/div\u003e\n\u003cdiv\u003e\n\u003cspan class=\"n\"\u003e08\u003c\/span\u003eDemolition \u0026amp; site control\u003c\/div\u003e\n\u003cdiv\u003e\n\u003cspan class=\"n\"\u003e09\u003c\/span\u003eRough-ins \u0026amp; inspections\u003c\/div\u003e\n\u003cdiv\u003e\n\u003cspan class=\"n\"\u003e10\u003c\/span\u003eLinings, waterproofing \u0026amp; tiling\u003c\/div\u003e\n\u003cdiv\u003e\n\u003cspan class=\"n\"\u003e11\u003c\/span\u003eFit-out, painting \u0026amp; finishes\u003c\/div\u003e\n\u003cdiv\u003e\n\u003cspan class=\"n\"\u003e12\u003c\/span\u003eCompletion \u0026amp; handover\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"prevent\"\u003e\n\u003cb\u003eWhat it protects you from\u003c\/b\u003e\u003cp\u003eReleasing a progress payment on a home where the rough-ins haven't passed inspection — because you know what “done” looks like in every room before a cent leaves your account.\u003c\/p\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\n\u003c!-- ===== MODULE 2 ===== --\u003e\n\u003cdiv class=\"pbx-bleed row rev2\"\u003e\n\u003cdiv class=\"rmedia\"\u003e\u003cdiv class=\"fwrap\"\u003e\n\u003cdiv class=\"frame\"\u003e\n\u003cdiv class=\"fbar\"\u003e\n\u003ci\u003e\u003c\/i\u003e\u003ci\u003e\u003c\/i\u003e\u003ci\u003e\u003c\/i\u003e\u003cspan class=\"u\"\u003eModule 2 — The Full Home Renovation Protection Guide\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cimg src=\"https:\/\/d2ol7oe51mr4n9.cloudfront.net\/user_3C6DhjXOUbDZ61W1X68aCopcGNT\/c598aeba-fe01-462b-bcba-4792066b4ee3.png\" width=\"860\" height=\"605\" alt=\"The Full Home Renovation Protection Guide — 40 costly mistakes, 24 trade red flags and 19 blind spots for UK whole-home renovations\"\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"cap\"\u003eModule 2 · 40 mistakes · 24 red flags · 19 blind spots\u003c\/div\u003e\n\u003c\/div\u003e\u003c\/div\u003e\n\u003cdiv class=\"mtext gld\"\u003e\n\u003cspan class=\"eb\"\u003eModule 2 · The Risk Layer\u003c\/span\u003e\n\u003cdiv class=\"mtitle serif\"\u003eThe Protection Guide\u003c\/div\u003e\n\u003cdiv class=\"rule\" style=\"background:var(--navy)\"\u003e\u003c\/div\u003e\n\u003cp class=\"promise\"\u003eYou walk in already knowing what goes wrong at whole-home scale — before it has the chance to go wrong on yours.\u003c\/p\u003e\n\u003cdiv class=\"mstats\"\u003e\n\u003cdiv class=\"c\"\u003e\n\u003cspan class=\"v\"\u003e40\u003c\/span\u003e\u003cspan class=\"k\"\u003eCostly mistakes\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"c\"\u003e\n\u003cspan class=\"v\"\u003e24\u003c\/span\u003e\u003cspan class=\"k\"\u003eTrade red flags\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"c\"\u003e\n\u003cspan class=\"v\"\u003e19\u003c\/span\u003e\u003cspan class=\"k\"\u003eBlind spots\u003c\/span\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cp class=\"b\" style=\"margin-top:14px;\"\u003eNot theory — the specific failures of whole-home projects, each with a documented cost range from £1,000 to £100,000-plus and the exact way to avoid it: demolition started before selections are locked, the deposit structure that hands a trade your leverage, the scope gap between two trades that each assumed the other had it. The 24 red flags are sorted by where they surface — quoting, contracts, on site, on invoices — so you catch the wrong trade before any money changes hands.\u003c\/p\u003e\n\u003cdiv class=\"prevent\"\u003e\n\u003cb\u003eWhat it protects you from\u003c\/b\u003e\u003cp\u003eSigning with the wrong trade — on a project where fifteen of them will quote you. You learn to read the warning signs while it still costs nothing to walk away.\u003c\/p\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\n\u003c!-- ===== MODULE 3 ===== --\u003e\n\u003cdiv class=\"pbx-bleed row\"\u003e\n\u003cdiv class=\"rmedia\"\u003e\u003cdiv class=\"fwrap\"\u003e\n\u003cdiv class=\"frame\"\u003e\n\u003cdiv class=\"fbar\"\u003e\n\u003ci\u003e\u003c\/i\u003e\u003ci\u003e\u003c\/i\u003e\u003ci\u003e\u003c\/i\u003e\u003cspan class=\"u\"\u003eModule 3 — The Full Home Planning Toolkit\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cimg src=\"https:\/\/d2ol7oe51mr4n9.cloudfront.net\/user_3C6DhjXOUbDZ61W1X68aCopcGNT\/19398fdf-c9d5-400e-ad54-daa61cd67d51.png\" width=\"860\" height=\"605\" alt=\"The Full Home Planning Toolkit dashboard — 12 interactive tools tracking budget, payments, variations, timeline and compliance for a whole-home renovation\"\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"cap\"\u003eModule 3 · The Planning Toolkit — 12 tools, one dashboard\u003c\/div\u003e\n\u003c\/div\u003e\u003c\/div\u003e\n\u003cdiv class=\"mtext nav\"\u003e\n\u003cspan class=\"eb\"\u003eModule 3 · The Working Tools\u003c\/span\u003e\n\u003cdiv class=\"mtitle serif\"\u003eThe Planning Toolkit\u003c\/div\u003e\n\u003cdiv class=\"rule\"\u003e\u003c\/div\u003e\n\u003cp class=\"promise\"\u003eEvery number, every change, every payment across the whole home — in one place, so nothing slips past you and no one can rewrite the story later.\u003c\/p\u003e\n\u003cp class=\"b\"\u003eWhen a trade says “that was always extra,” the homeowner who can't point to the record is the one who pays. This is where you keep the record for the entire project: your budget against every quote, every variation in writing, every payment milestone, every certificate — saved automatically on your device and working offline on a noisy site. Twelve tools on one dashboard, anchored by a 77-item Renovation A–Z that tracks the whole build.\u003c\/p\u003e\n\u003cdiv class=\"tg\"\u003e\n\u003cdiv class=\"c b\"\u003e\n\u003ch5\u003eStay on budget\u003c\/h5\u003e\n\u003cdiv class=\"gd\"\u003eKnow the moment a number drifts.\u003c\/div\u003e\n\u003cul\u003e\n\u003cli\u003eBudget Tracker\u003c\/li\u003e\n\u003cli\u003ePayment Tracker\u003c\/li\u003e\n\u003cli\u003eVariation Log\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"c n\"\u003e\n\u003ch5\u003eStay on schedule\u003c\/h5\u003e\n\u003cdiv class=\"gd\"\u003eFifteen trades, nothing redone.\u003c\/div\u003e\n\u003cul\u003e\n\u003cli\u003eTimeline Planner\u003c\/li\u003e\n\u003cli\u003eProcurement Tracker\u003c\/li\u003e\n\u003cli\u003eMaterials Register\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"c s\"\u003e\n\u003ch5\u003eIn control on site\u003c\/h5\u003e\n\u003cdiv class=\"gd\"\u003eA record nobody can argue with.\u003c\/div\u003e\n\u003cul\u003e\n\u003cli\u003eSite Diary\u003c\/li\u003e\n\u003cli\u003eInspection Checklist\u003c\/li\u003e\n\u003cli\u003eDefect List\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"c k\"\u003e\n\u003ch5\u003eFinish protected\u003c\/h5\u003e\n\u003cdiv class=\"gd\"\u003eCertificates and warranties, secured.\u003c\/div\u003e\n\u003cul\u003e\n\u003cli\u003eCompliance Tracker\u003c\/li\u003e\n\u003cli\u003eWarranty Register\u003c\/li\u003e\n\u003cli\u003eRenovation A–Z Checklist\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\n\u003c!-- ===== MODULE 4 ===== --\u003e\n\u003cdiv class=\"pbx-bleed row rev2\"\u003e\n\u003cdiv class=\"rmedia\"\u003e\u003cdiv class=\"fwrap\"\u003e\n\u003cdiv class=\"frame\"\u003e\n\u003cdiv class=\"fbar\"\u003e\n\u003ci\u003e\u003c\/i\u003e\u003ci\u003e\u003c\/i\u003e\u003ci\u003e\u003c\/i\u003e\u003cspan class=\"u\"\u003eModule 4 — The On-Site Handbook\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cimg src=\"https:\/\/d2ol7oe51mr4n9.cloudfront.net\/user_3C6DhjXOUbDZ61W1X68aCopcGNT\/4edcc1ff-0e27-4d59-a5f6-74628e65ee89.png\" width=\"860\" height=\"605\" alt=\"The Full Home On-Site Handbook — whole-home measurements, 21-step build sequence and payment hold points, built for your phone\"\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"cap\"\u003eModule 4 · 6 on-site reference sheets — built for your phone\u003c\/div\u003e\n\u003c\/div\u003e\u003c\/div\u003e\n\u003cdiv class=\"mtext gld\"\u003e\n\u003cspan class=\"eb\"\u003eModule 4 · On-Site\u003c\/span\u003e\n\u003cdiv class=\"mtitle serif\"\u003eThe On-Site Handbook\u003c\/div\u003e\n\u003cdiv class=\"rule\" style=\"background:var(--navy)\"\u003e\u003c\/div\u003e\n\u003cp class=\"promise\"\u003eThe right numbers and the right questions in your pocket — so you can check any trade's work, in any room, before they move on.\u003c\/p\u003e\n\u003cp class=\"b\"\u003eA whole-home site is loud, fast, and no place to read a manual. The Handbook strips everything down to 6 reference sheets built for your phone — so when the tiler asks about falls, the carpenter about door clearances or the electrician about socket heights, you answer with the number, not a shrug.\u003c\/p\u003e\n\u003cdiv class=\"sheets\"\u003e\n\u003cdiv class=\"sh\"\u003e\n\u003cspan class=\"pg\"\u003e01\u003c\/span\u003e\u003cdiv\u003e\n\u003cdiv class=\"st\"\u003eWhole-home measurements \u0026amp; clearances\u003c\/div\u003e\n\u003cdiv class=\"sd\"\u003eEvery room's critical dimensions — kitchen, bathrooms, laundry, doors, hallways — to British Standards.\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"sh\"\u003e\n\u003cspan class=\"pg\"\u003e02\u003c\/span\u003e\u003cdiv\u003e\n\u003cdiv class=\"st\"\u003eBuild sequence \u0026amp; trade order\u003c\/div\u003e\n\u003cdiv class=\"sd\"\u003eThe 21-step whole-home sequence with inspection hold points — do not reorder.\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"sh\"\u003e\n\u003cspan class=\"pg\"\u003e03\u003c\/span\u003e\u003cdiv\u003e\n\u003cdiv class=\"st\"\u003eOn-site daily operations\u003c\/div\u003e\n\u003cdiv class=\"sd\"\u003eWhat to check, photograph and log on every visit.\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"sh\"\u003e\n\u003cspan class=\"pg\"\u003e04\u003c\/span\u003e\u003cdiv\u003e\n\u003cdiv class=\"st\"\u003ePayments, compliance \u0026amp; handover\u003c\/div\u003e\n\u003cdiv class=\"sd\"\u003eMilestone hold-points — stop \u0026amp; verify before you pay.\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"sh\"\u003e\n\u003cspan class=\"pg\"\u003e05\u003c\/span\u003e\u003cdiv\u003e\n\u003cdiv class=\"st\"\u003eKey contacts \u0026amp; emergency numbers\u003c\/div\u003e\n\u003cdiv class=\"sd\"\u003eAll fifteen trades, registration numbers and after-hours contacts in one place.\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"sh\"\u003e\n\u003cspan class=\"pg\"\u003e06\u003c\/span\u003e\u003cdiv\u003e\n\u003cdiv class=\"st\"\u003eKey dates \u0026amp; project reference\u003c\/div\u003e\n\u003cdiv class=\"sd\"\u003ePermits, insurance, milestones and meter locations — the project's vital records.\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\n\u003c!-- ===== COMPARISON ===== --\u003e\n\u003cdiv class=\"pbx-bleed crm\"\u003e\u003cdiv class=\"sec\"\u003e\n\u003cdiv class=\"ctr\" style=\"margin-bottom:8px;\"\u003e\n\u003cspan class=\"eb\"\u003ePrepared vs unprepared\u003c\/span\u003e\u003ch2 class=\"h serif\"\u003eYour renovation is decided before the first trade arrives.\u003c\/h2\u003e\n\u003cdiv class=\"rule\" style=\"margin:14px auto 0;\"\u003e\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"ctab\"\u003e\n\u003cdiv class=\"chead\"\u003e\n\u003cdiv class=\"l\"\u003eWhere it counts\u003c\/div\u003e\n\u003cdiv class=\"ba\"\u003eWithout a plan\u003c\/div\u003e\n\u003cdiv class=\"go\"\u003eWith the Blueprint\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"crow\"\u003e\n\u003cdiv class=\"dim\"\u003e\n\u003cstrong\u003eBudget\u003c\/strong\u003e\u003cspan class=\"dsc\"\u003eWhat it all ends up costing\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"ba\"\u003e\n\u003ci\u003e✗\u003c\/i\u003e\u003cspan\u003e\u003cstrong\u003eMoney slips away.\u003c\/strong\u003e Set by surprises and overruns, room after room\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"go\"\u003e\n\u003ci\u003e✓\u003c\/i\u003e\u003cspan\u003e\u003cstrong\u003eYour money stays yours.\u003c\/strong\u003e Held to the plan, not to surprises\u003c\/span\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"crow\"\u003e\n\u003cdiv class=\"dim\"\u003e\n\u003cstrong\u003eSequencing\u003c\/strong\u003e\u003cspan class=\"dsc\"\u003eFifteen trades, one order\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"ba\"\u003e\n\u003ci\u003e✗\u003c\/i\u003e\u003cspan\u003e\u003cstrong\u003eTrades collide.\u003c\/strong\u003e Rework, comeback fees and idle weeks\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"go\"\u003e\n\u003ci\u003e✓\u003c\/i\u003e\u003cspan\u003e\u003cstrong\u003eThe right trade, at the right step.\u003c\/strong\u003e 21 steps with hold points between them\u003c\/span\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"crow\"\u003e\n\u003cdiv class=\"dim\"\u003e\n\u003cstrong\u003eVariations\u003c\/strong\u003e\u003cspan class=\"dsc\"\u003eChanges made mid-build\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"ba\"\u003e\n\u003ci\u003e✗\u003c\/i\u003e\u003cspan\u003e\u003cstrong\u003eSurprise bills land later.\u003c\/strong\u003e Agreed verbally, priced on the spot\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"go\"\u003e\n\u003ci\u003e✓\u003c\/i\u003e\u003cspan\u003e\u003cstrong\u003eNo surprise bills.\u003c\/strong\u003e Every change agreed in writing first\u003c\/span\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"crow\"\u003e\n\u003cdiv class=\"dim\"\u003e\n\u003cstrong\u003ePayments\u003c\/strong\u003e\u003cspan class=\"dsc\"\u003eWhen money is released\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"ba\"\u003e\n\u003ci\u003e✗\u003c\/i\u003e\u003cspan\u003e\u003cstrong\u003eYour cash, exposed.\u003c\/strong\u003e Released whenever the builder asks\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"go\"\u003e\n\u003ci\u003e✓\u003c\/i\u003e\u003cspan\u003e\u003cstrong\u003eYour cash, protected.\u003c\/strong\u003e You pay only for work that's done and inspected\u003c\/span\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"crow\"\u003e\n\u003cdiv class=\"dim\"\u003e\n\u003cstrong\u003eQuotes\u003c\/strong\u003e\u003cspan class=\"dsc\"\u003eHow you compare builders\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"ba\"\u003e\n\u003ci\u003e✗\u003c\/i\u003e\u003cspan\u003e\u003cstrong\u003eGuesswork, not clarity.\u003c\/strong\u003e Compared apples to oranges\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"go\"\u003e\n\u003ci\u003e✓\u003c\/i\u003e\u003cspan\u003e\u003cstrong\u003eConfidence, not guesswork.\u003c\/strong\u003e Compared like-for-like, line by line\u003c\/span\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"crow\"\u003e\n\u003cdiv class=\"dim\"\u003e\n\u003cstrong\u003eYour position\u003c\/strong\u003e\u003cspan class=\"dsc\"\u003eWhere you stand in it all\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"ba\"\u003e\n\u003ci\u003e✗\u003c\/i\u003e\u003cspan\u003e\u003cstrong\u003eAt the mercy of the job.\u003c\/strong\u003e Hoping months of work go to plan\u003c\/span\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"go\"\u003e\n\u003ci\u003e✓\u003c\/i\u003e\u003cspan\u003e\u003cstrong\u003eCalm and in control.\u003c\/strong\u003e You set the terms, start to finish\u003c\/span\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\u003c\/div\u003e\n\n\u003c!-- ===== BUILT FOR THE UK ===== --\u003e\n\u003cdiv class=\"pbx-bleed nav\"\u003e\u003cdiv class=\"sec\"\u003e\n\u003cspan class=\"eb\"\u003eBuilt for the United Kingdom\u003c\/span\u003e\n\u003ch2 class=\"h serif\"\u003eBuilt for how the United Kingdom actually renovates — nation by nation.\u003c\/h2\u003e\n\u003cdiv class=\"rule\"\u003e\u003c\/div\u003e\n\u003cp class=\"lede\" style=\"max-width:680px;\"\u003eEvery consent threshold, registration rule, building-control route and cost figure is the one that applies where you live — from England and Wales to Scotland and Northern Ireland.\u003c\/p\u003e\n\u003cdiv class=\"au\"\u003e\n\u003cdiv class=\"c\"\u003e\n\u003ch4\u003eAll four nations — covered\u003c\/h4\u003e\n\u003cp\u003eApproval pathways, building-control routes and thresholds, trade-registration bodies and consumer-protection rules for where you live — England, Wales, Scotland and Northern Ireland. Pick your nation once in \u003cstrong\u003eNation Watch\u003c\/strong\u003e and the whole Blueprint reloads around it — approval routes, building control, property tax and consumer rules.\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"c\"\u003e\n\u003ch4\u003eUK building rules, in plain English\u003c\/h4\u003e\n\u003cp\u003eMapped to the Building Regulations and your local building-control body — translated into what to check, and when, so nothing slips past your building-control surveyor at rough-in or handover.\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"c\"\u003e\n\u003ch4\u003eUK trades \u0026amp; real pound-sterling pricing\u003c\/h4\u003e\n\u003cp\u003eBuilt around UK trade registration (Gas Safe, Part P) and British Standards, with current pound-sterling costs for the whole build — so you budget tight and compare quotes with confidence.\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"c\"\u003e\n\u003ch4\u003eThe details a UK building-control surveyor checks\u003c\/h4\u003e\n\u003cp\u003eTanking to Approved Document C and BS 5385-4 before a single tile, rough-in inspections before the walls close, smoke alarms on every storey, and asbestos testing before demolition in older homes — flagged before your trades start, not discovered after.\u003c\/p\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\u003c\/div\u003e\n\n\u003c!-- ===== EXPERT QUOTE ===== --\u003e\n\u003cdiv class=\"pbx-bleed crm\"\u003e\u003cdiv class=\"sec ctr\" style=\"padding:60px 34px;\"\u003e\n\u003cspan class=\"eb\"\u003eBehind the 12 Phase System\u003c\/span\u003e\n\u003cp class=\"qlead\"\u003eThis Blueprint wasn't written from a textbook. Every phase, checklist and red flag in it came out of managing real renovations end to end — comparing quotes line by line, getting variations agreed in writing before they turned into invoices, and holding final payment until every defect was fixed. It's the method that worked on real projects, written down so you can run yours the same way.\u003c\/p\u003e\n\u003cdiv class=\"quote\"\u003e\n\u003cp\u003e“Every trade on your renovation has done their part of the job a hundred times. But nobody on that site has run \u003cem\u003eyour\u003c\/em\u003e whole home before — and the person coordinating it is the one who decides how it ends. Property Blueprint Co. exists to make that person the best-prepared one on site: you.”\u003c\/p\u003e\n\u003cdiv class=\"by\"\u003e— Mossy · Founder, Property Blueprint Co.\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\u003c\/div\u003e\n\n\u003c!-- ===== WHO ===== --\u003e\n\u003cdiv class=\"pbx-bleed gld\"\u003e\u003cdiv class=\"sec\"\u003e\n\u003cdiv class=\"ctr\" style=\"margin-bottom:8px;\"\u003e\n\u003cspan class=\"eb\"\u003eWho this is for\u003c\/span\u003e\u003ch2 class=\"h serif\"\u003eIs the Full Home Blueprint right for you?\u003c\/h2\u003e\n\u003cdiv class=\"rule\" style=\"margin:14px auto 0;\"\u003e\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"who\"\u003e\n\u003cdiv class=\"c g\"\u003e\n\u003ch4 class=\"serif\"\u003eBuilt for you if…\u003c\/h4\u003e\n\u003cul\u003e\n\u003cli\u003eYou're renovating most or all of your home as one project — kitchen, bathrooms, living areas and more — managing it yourself, or running a builder and wanting to stay in control\u003c\/li\u003e\n\u003cli\u003eYou have quotes back and no reliable way to tell if they're accurate, comparable or fair\u003c\/li\u003e\n\u003cli\u003eYou're about to sign a building contract and want to know exactly what to check first\u003c\/li\u003e\n\u003cli\u003eYou're weighing the big calls right now — live in or move out, staged or all at once, builder or owner-managed\u003c\/li\u003e\n\u003cli\u003eYou've had a renovation go sideways before and are determined not to repeat it at whole-home scale\u003c\/li\u003e\n\u003cli\u003eYou're an investor repositioning a property anywhere in the UK\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"c n\"\u003e\n\u003ch4 class=\"serif\"\u003eThis is not a DIY construction guide\u003c\/h4\u003e\n\u003cul\u003e\n\u003cli\u003eYou'll still hire professional builders and registered electrical, plumbing \u0026amp; gas trades — the system assumes you will\u003c\/li\u003e\n\u003cli\u003eWhat it teaches is everything around the trades: how to brief, compare, contract, sequence and manage them, and handle variations\u003c\/li\u003e\n\u003cli\u003eRenovating one room at a time instead? The room Blueprints are built for exactly that — this one is for the whole home run as one build\u003c\/li\u003e\n\u003cli\u003eNo prior renovation experience required\u003c\/li\u003e\n\u003cli\u003eBuilt for first-timers — and for people who learned the hard way last time\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\u003c\/div\u003e\n\n\u003c!-- ===== DELIVERY \/ GUARANTEE ===== --\u003e\n\u003cdiv class=\"pbx-bleed nav\"\u003e\u003cdiv class=\"sec\"\u003e\n\u003cdiv class=\"ctr\"\u003e\n\u003cspan class=\"eb\"\u003eAccess \u0026amp; delivery\u003c\/span\u003e\u003ch2 class=\"h serif\"\u003eInstant. Permanent. Works anywhere.\u003c\/h2\u003e\n\u003cdiv class=\"rule\" style=\"margin:14px auto 22px;\"\u003e\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"del\"\u003e\n\u003cdiv class=\"d\"\u003e\n\u003cdiv class=\"dico\"\u003e\u003csvg viewbox=\"0 0 24 24\"\u003e\u003cpath d=\"M12 3v12\"\u003e\u003c\/path\u003e\u003cpath d=\"M7 11l5 5 5-5\"\u003e\u003c\/path\u003e\u003cpath d=\"M5 21h14\"\u003e\u003c\/path\u003e\u003c\/svg\u003e\u003c\/div\u003e\n\u003cdiv class=\"dt serif\"\u003eInstant download\u003c\/div\u003e\n\u003cdiv class=\"db\"\u003eAll four modules and the Calculator arrive the moment your purchase is confirmed.\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"d\"\u003e\n\u003cdiv class=\"dico\"\u003e\u003csvg viewbox=\"0 0 24 24\"\u003e\u003crect x=\"5\" y=\"3\" width=\"14\" height=\"18\" rx=\"2.5\"\u003e\u003c\/rect\u003e\u003cpath d=\"M10 18h4\"\u003e\u003c\/path\u003e\u003c\/svg\u003e\u003c\/div\u003e\n\u003cdiv class=\"dt serif\"\u003eAny device\u003c\/div\u003e\n\u003cdiv class=\"db\"\u003eOpens in any browser on phone, tablet, laptop or desktop.\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"d\"\u003e\n\u003cdiv class=\"dico\"\u003e\u003csvg viewbox=\"0 0 24 24\"\u003e\u003crect x=\"5\" y=\"11\" width=\"14\" height=\"9\" rx=\"2\"\u003e\u003c\/rect\u003e\u003cpath d=\"M8 11V8a4 4 0 0 1 8 0v3\"\u003e\u003c\/path\u003e\u003c\/svg\u003e\u003c\/div\u003e\n\u003cdiv class=\"dt serif\"\u003eFully offline\u003c\/div\u003e\n\u003cdiv class=\"db\"\u003eSaved to your device. Works on a job site with no signal.\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cp class=\"reassure ctr\"\u003e30-day money-back guarantee · one email, full refund · no conditions, no forms, no questions\u003c\/p\u003e\n\u003c\/div\u003e\u003c\/div\u003e\n\n\u003c!-- ===== FAQ ===== --\u003e\n\u003cdiv class=\"pbx-bleed crm\"\u003e\u003cdiv class=\"sec\"\u003e\n\u003cdiv class=\"ctr\" style=\"margin-bottom:10px;\"\u003e\n\u003cspan class=\"eb\"\u003eBefore you decide\u003c\/span\u003e\u003ch2 class=\"h serif\"\u003eWhole-home renovation questions, answered\u003c\/h2\u003e\n\u003cdiv class=\"rule\" style=\"margin:14px auto 0;\"\u003e\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"faq\"\u003e\n\u003cdetails open\u003e\u003csummary\u003eDo I need planning permission for a whole-home renovation in the UK?\u003c\/summary\u003e\u003cdiv class=\"ans\"\u003eIt depends on scope. Like-for-like internal work — new kitchens, bathrooms and finishes in the same layout — is often outside planning control altogether, though Building Regulations may still apply. Approval is generally triggered when you remove structural walls, extend, relocate plumbing or drainage, or change the building's footprint — and at whole-home scale most projects touch at least one trigger. Phase 4 of the Blueprint shows you exactly which side of the line each part of your project sits on, nation by nation — pick yours in Nation Watch and it loads the approval route, building-control body and technical standards — and which certificates to collect before final payment.\u003c\/div\u003e\u003c\/details\u003e\n\u003cdetails\u003e\u003csummary\u003eWhen does a whole-home renovation need a written building contract?\u003c\/summary\u003e\u003cdiv class=\"ans\"\u003eAt whole-home scale, virtually always. The UK has no licensing system or statutory contract threshold for builders — which is exactly why the written contract is your protection layer: a JCT Home Owner contract (or equivalent) plus your rights under the Consumer Rights Act 2015. The Blueprint walks you through what must be in that contract, and the Protection Guide flags the trade who won't put a six-figure job in writing as the red flag it is.\u003c\/div\u003e\u003c\/details\u003e\n\u003cdetails\u003e\u003csummary\u003eShould we live in the home during the renovation, or move out?\u003c\/summary\u003e\u003cdiv class=\"ans\"\u003eIt's one of the most expensive decisions on the project, and the Blueprint treats it that way. Phase 7 puts every option side by side — staying with family, a short-term rental, a caravan on site, or living in the home through staged works — with real costs, extension risk and when each one actually works. You lock the decision before demolition day, not during it.\u003c\/div\u003e\u003c\/details\u003e\n\u003cdetails\u003e\u003csummary\u003eCan I manage fifteen trades myself, or do I need a builder?\u003c\/summary\u003e\u003cdiv class=\"ans\"\u003eBoth paths are built in. Run the project yourself — the Blueprint covers your CDM client duties and building-control routes nation by nation — or engage a builder and use the system to stay in control of quotes, variations, payments and quality. Either way, you know what should be happening in every room, in what order, and what to ask when it isn't.\u003c\/div\u003e\u003c\/details\u003e\n\u003cdetails\u003e\u003csummary\u003eI have no renovation experience. Will it work for me?\u003c\/summary\u003e\u003cdiv class=\"ans\"\u003eYes. It's built for homeowners taking on a whole-home renovation for the first time — or who've renovated before and learned the hard way what they didn't know. No building knowledge is assumed: every phase is in plain language, every action is specific, and every tool is pre-populated so you're never staring at a blank screen.\u003c\/div\u003e\u003c\/details\u003e\n\u003cdetails\u003e\u003csummary\u003eMy renovation has already started. Is it too late?\u003c\/summary\u003e\u003cdiv class=\"ans\"\u003eNo — but the earlier the better. At the quoting or contracting stage you get the most from the 12 phases in sequence. If you're already mid-build, open the Planning Toolkit immediately — the Variation Log, Site Diary and Payment Tracker are useful from day one, the build-sequence sheet tells you instantly whether your trades are in the right order, and the Protection Guide is relevant at any point.\u003c\/div\u003e\u003c\/details\u003e\n\u003cdetails\u003e\u003csummary\u003eIs this a PDF or e-book?\u003c\/summary\u003e\u003cdiv class=\"ans\"\u003eNo. All four modules are interactive guides that open in any browser on any device — the Blueprint tracks your 168 decision points as you go, the Planning Toolkit saves your figures as you work, and everything runs completely offline with nothing to install and no account. It's a working system you use for the length of the renovation, not a static document you read once.\u003c\/div\u003e\u003c\/details\u003e\n\u003cdetails\u003e\u003csummary\u003eIs it really worth £247?\u003c\/summary\u003e\u003cdiv class=\"ans\"\u003ePut it against the alternatives. A project manager runs 8–12% of build cost — £12,000 to £70,000-plus on a typical whole home. A quantity surveyor's cost plan alone is £1,500 to £3,000. The Blueprint is £247 — less than half of one per cent of a typical whole-home budget — and it only has to stop one of the 40 documented mistakes, once, to have paid for itself many times over. One payment, kept for every renovation after this one.\u003c\/div\u003e\u003c\/details\u003e\n\u003cdetails\u003e\u003csummary\u003eI already own one of the room Blueprints. How is this different?\u003c\/summary\u003e\u003cdiv class=\"ans\"\u003eThe room Blueprints go deep on a single room renovated as its own project. The Full Home Blueprint is built for the different, harder problem: many rooms renovated as one build — one budget, one programme, fifteen trades moving through the whole house in a 21-step sequence, and decisions in one room that change what happens in the next. If you're renovating one room at a time, the room Blueprints are the right tool. If it's one project across the home, this is.\u003c\/div\u003e\u003c\/details\u003e\n\u003cdetails\u003e\u003csummary\u003eIs there support if I get stuck?\u003c\/summary\u003e\u003cdiv class=\"ans\"\u003eYes — personal email support. Email us with any question about your renovation and you'll hear back from a real person who knows the system. Not a chatbot, not a ticket queue.\u003c\/div\u003e\u003c\/details\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\u003c\/div\u003e\n\n\u003c!-- PBC-END --\u003e\n\u003c\/div\u003e\n","brand":"Property Blueprint Co.","offers":[{"title":"Default Title","offer_id":52488179319077,"sku":"PBC-FULLHOME-UK","price":247.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0991\/7012\/4069\/files\/f581a0f6-7492-4e5f-9c00-d148a420dfaf.png?v=1785362413","url":"https:\/\/propertyblueprintco.com\/en-gb\/products\/full-home-renovation-blueprint-uk","provider":"Property Blueprint Co.","version":"1.0","type":"link"}