The Kitchen Renovation Blueprint — complete kitchen renovation planning system for Irish homeowners, shown on laptop, tablet and phone

The Kitchen Renovation Blueprint – IE Edition

€117,00 EUR
Sale price  €117,00 EUR Regular price 
Skip to product information
The Kitchen Renovation Blueprint — complete kitchen renovation planning system for Irish homeowners, shown on laptop, tablet and phone
Know every phase, every cost, every decision.

The Kitchen Renovation Blueprint – IE Edition

€117,00 EUR
Sale price  €117,00 EUR Regular price 
★★★★★16 reviews
One payment. No subscription. Yours permanently.
30-day money-back guarantee - no questions asked.
Payment methods
  • American Express
  • Apple Pay
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Union Pay
  • Visa
★ 4.94 from verified homeowners·Instant download·Lifetime access·30-day money-back guarantee·No subscription·Works offline·

What is the Kitchen Renovation Blueprint?

It's the complete planning system for an Irish kitchen renovation — the 12 phases, every cost, and the exact questions to ask, from first design brief to final sign-off and Certificate of Compliance on Completion. It puts you on equal footing with the trades, whether you run the job yourself or hire a builder. Four interactive modules — the Blueprint, the Protection Guide, the Planning Toolkit and the On-Site Handbook — plus a Renovation Cost Calculator. Yours permanently, for every kitchen you ever renovate.

Format: Interactive, works offlineFor: Irish homeowners & investors · any kitchen, refresh to rebuildDelivery: Instant download
What unpreparedness costs

What does it cost to walk into a kitchen reno unprepared?

On an Irish kitchen — whether it's a €5,000 refresh or a €20,000 to €45,000, and €35,000 to €70,000-plus in Dublin rebuild — arriving unprepared costs more than it should: on a bigger job, the tens of thousands below; on a smaller one, the overpriced quote or the variation you didn't spot. Not as one bill you'd notice, but as a handful you don't.

A single verbally approved variation — not in writing, not verified€1,500 – €6,500
Misaligned quotes — comparing different scopes without realising it€4,000 – €12,000
Releasing final payment before the defects list is raised€1,200 – €5,000
Missing allowances, exclusions & prime-cost sums at contract stage€2,500 – €10,000
The Kitchen Renovation Blueprint€117 EUR

Stop one unnecessary variation, or catch one overpriced quote, and the Blueprint has paid for itself — even on a modest update. It protects most when you have it before you sign anything.

What's inside

What's inside the Kitchen Blueprint?

One system, four modules, plus the Renovation Cost Calculator. The Blueprint teaches you the 12 phases; the other three hand you the tools to run them — a risk guide, a working toolkit, and an on-site handbook for your phone.

Built from years of hands-on renovation experience — every phase tested on real Irish projects, not theory.

Module 1 · The Foundation

The Renovation Blueprint

The 12 Phase System in full — what should happen at every phase, when, and what to ask. 114 decision points across 12 phases.

Module 2 · The Risk Layer

The Protection Guide

49 costly mistakes, 15 trade red flags and 16 kitchen blind spots — what goes wrong on every kitchen, before it goes wrong on yours.

Module 3 · The Working Tools

The Planning Toolkit

12 interactive tools that keep your budget, variations and payments under control — saving automatically, working offline.

Module 4 · On-Site

The On-Site Handbook

5 reference sheets — measurements, build sequence, daily checks, payments, contacts — on your phone, with or without signal.

Module 1 — The Kitchen Renovation Blueprint
The Kitchen Renovation Blueprint module 1 — the 12 Phase System for an Irish kitchen renovation, shown on a tablet
Module 1 · The 12 Phase System
Module 2 — The Kitchen Protection Guide
The Kitchen Protection Guide — 49 costly mistakes, 15 trade red flags and 16 blind spots for Irish kitchen renovations
Module 2 · 49 mistakes · 15 red flags · 16 blind spots
Module 2 · The Risk Layer
The Protection Guide

You walk in already knowing what goes wrong on a kitchen — before it has the chance to go wrong on yours.

49Costly mistakes
15Trade red flags
16Blind spots

Not theory — the specific things that go wrong on Irish kitchens: the day-rate arrangement that should have been fixed-price, the contract term no one flagged, the trade who won't put a major job in writing. The red flags are sorted by where they surface — quoting, on site, on invoices — so you catch the wrong trade in the quoting phase, before any money changes hands. With €3,000–€25,000+ on the line, reading this before you sign changes what you ask and what you refuse to approve.

What it protects you from

Signing with the wrong trade. You learn to read the warning signs in the quoting phase — before any money has changed hands.

Module 3 — The Kitchen Planning Toolkit
The Kitchen Planning Toolkit — interactive budget, variation and payment trackers for an Irish kitchen renovation
Module 3 · The Planning Toolkit — quoted vs actual, auto-calculated
Module 4 — The On-Site Handbook
The Kitchen On-Site Handbook — measurements, build sequence and payment reference sheets built for your phone
Module 4 · 5 on-site reference sheets — built for your phone
Module 4 · On-Site
The On-Site Handbook

The right numbers and the right questions in your pocket — so you can check any trade's work before they move on.

A kitchen site is loud, fast, and no place to read a manual. The Handbook strips everything down to 5 reference sheets built for your phone — so when the cabinetmaker asks about clearances or the electrician about socket placement, you answer with the number, not a shrug.

01
Measurements & clearances
Irish-standard worktop heights, walkways, work-triangle, socket placement.
02
Build sequence & trade order
The fixed order trades must follow — do not reorder.
03
On-site daily operations
What to check, photograph and log on every visit.
04
Payments, compliance & handover
Milestone hold-points — stop & verify before you pay.
05
Key contacts & site details
Every trade and registration number in one place.
Prepared vs unprepared

Your kitchen is decided before the first trade arrives.

Where it counts
Without a plan
With the Blueprint
BudgetWhat it all ends up costing
Money slips away. Set by surprises and overruns
Your money stays yours. Held to the plan, not to surprises
VariationsChanges made mid-build
Surprise bills land later. Agreed verbally, priced on the spot
No surprise bills. Every change agreed in writing first
PaymentsWhen money is released
Your cash, exposed. Released whenever the builder asks
Your cash, protected. You pay only for work that's done
QuotesHow you compare builders
Guesswork, not clarity. Compared apples to oranges
Confidence, not guesswork. Compared like-for-like, line by line
Your positionWhere you stand in it all
At the mercy of the job. Hoping it goes to plan
Calm and in control. You set the terms, start to finish
Behind the 12 Phase System

This Blueprint wasn't written from a textbook. Every phase, checklist and red flag in it came out of managing real renovations end to end — comparing quotes line by line, getting variations agreed in writing before they turned into invoices, and holding final payment until every defect was fixed. It's the method that worked on real projects, written down so you can run yours the same way.

“The builder quoting your kitchen has had this conversation a hundred times. They know the process, they know where the money moves, and they know which homeowners ask the right questions and which don't. Property Blueprint Co. exists to put you on equal footing — to give you the framework the trade already has.”

— Mossy · Founder, Property Blueprint Co.
Who this is for

Is the Kitchen Blueprint right for you?

Built for you if…

  • You're updating your kitchen — anything from a €5,000 refresh to a full rebuild — and want to stay in control, whether you manage it yourself or hire a builder
  • You have quotes back and no reliable way to tell if they're accurate, comparable or fair
  • You're about to sign a building contract and want to know exactly what to check first
  • Your renovation starts in the next 1–12 months
  • You've had a renovation go sideways before and are determined not to repeat it
  • You're an investor managing a kitchen renovation on a rental anywhere in Ireland

This is not a DIY construction guide

  • You'll still hire a registered builder (CIRI) and registered electrical, plumbing & gas trades — the system assumes you will
  • What it teaches is everything around the trades: how to brief, compare, contract and manage them, and handle variations
  • No prior renovation experience required
  • No building or trade background required
  • Built for first-timers — and for people who learned the hard way last time
Before you decide

Kitchen renovation questions, answered

Do I need planning permission or Building Control approval for a kitchen renovation in Ireland?
Most like-for-like kitchen renovations — replacing cabinetry, worktops and appliances in the same layout — do not require planning permission. Consent is generally required when you remove a load-bearing wall, relocate plumbing or drainage, or alter electrical circuits beyond standard replacement. Notifiable work under the Building Control (Amendment) Regulations (BCAR) ends in a Certificate of Compliance on Completion, lodged on the BCMS. Phase 4 of the Blueprint shows you exactly which side of that line your project sits on, which work must be done or supervised by a registered builder (CIRI), and which electrical and gas certificates to collect before final payment.
When does my kitchen renovation need a written building contract?
A written contract is essential for any kitchen renovation, and non-negotiable once the job reaches €30,000 or more. It should set out the fixed price, the full scope with allowances and prime-cost sums, the milestone payment schedule, the programme, and how variations are agreed in writing. For notifiable work under the Building Control Regulations (BCAR), an Assigned Certifier and BCAR compliance apply, and the job ends in a Certificate of Compliance on Completion lodged on the BCMS. The Blueprint walks you through what must be in that contract, and the Protection Guide flags the red flag of a builder who won't put a major job in writing.
Will this work whether I manage it myself or hire a builder?
Both. Run the kitchen yourself, or use it to stay in control while a builder does the work — either way you'll know what should happen at every phase and exactly what to ask, so nothing important gets decided without you.
I have no renovation experience. Will it work for me?
Yes. It's built for homeowners managing a kitchen renovation for the first time — or who've done it before and learned the hard way what they didn't know. No building knowledge is assumed: every phase is in plain language, every action is specific, and every tool is pre-populated so you're never staring at a blank screen.
My renovation has already started. Is it too late?
No — but the earlier the better. At the quoting or contracting stage you get the most from the 12 phases in sequence. If you're already mid-build, open the Planning Toolkit immediately — the Variation Log, Site Diary and Payment Tracker are useful from day one, and the Protection Guide is relevant at any point.
Is this a PDF or e-book?
No. All four modules are interactive guides that open in any browser on any device — the Planning Toolkit saves your figures as you work and runs completely offline, with nothing to install and no account. It's a working system you use throughout the renovation, not a static document you read once.
Is it really worth €117?
Stop a single unnecessary variation, or compare one set of quotes properly, and it typically pays for itself many times over — against a kitchen that runs €20,000 to €70,000-plus. And it's one payment, kept for every renovation after this one.
Is there support if I get stuck?
Yes — personal email support. Email us with any question about your renovation and you'll hear back from a real person who knows the system. Not a chatbot, not a ticket queue.
What is a realistic budget for a kitchen renovation in Ireland?
A realistic budget is the one built from your scope rather than someone else’s average — the spend is set by your finishes, your layout and the trades your kitchen pulls in. The Blueprint includes a cost planner that prices your renovation trade by trade, so you know your number before the first quote arrives.
How long does a kitchen renovation take?
Longer than the brochure answer, and the difference is rarely the speed of the trades — it is the order they arrive in. Duration is set by trade sequence, and one missed hand-off can idle a site for a week. The Blueprint’s timeline tool maps your sequence, so the calendar is set by your plan rather than by whoever turns up next.
How do I start renovating my kitchen?
Not with a sledgehammer and not with a showroom visit — with a sequence. Scope first, then budget, then quotes, then contract, then trades in order: the first three phases decide most of what the renovation will cost and how long it will take. The Blueprint walks you through all twelve phases from exactly this starting point.
What do verified buyers say?
The Blueprints are rated 4.9 out of 5 by verified buyers. Their words are better evidence than ours — read the reviews here.