Renovation Cost Calculator — Property Blueprint Co.
Beautifully renovated kitchen
Property Blueprint Co.

What will your renovation actually cost?

A trade-by-trade estimate built for your home, your finishes and your postcode — and exactly where builders add their margin.

★★★★★ 4.94 / 5
Step 1 of 14
Step 1 of 14
Where are you located?
Renovation costs, trade standards, and building regulations vary significantly by country. Select your location for an accurate local estimate.
Step 2 of 14
What are you renovating?
Select the room or renovation type you're planning.
🍳

Kitchen

Cabinetry, appliances, benchtop

🚿

Bathroom

Tiles, vanity, waterproofing

🧺

Laundry

Cabinetry, appliances, trough

🌿

Outdoor

Deck, paving, landscaping

🏠

Full Home Renovation

Multiple rooms — kitchen, bathrooms, laundry, outdoor

Step 3 of 14
Renovation scope
Step 4 of 14
Size
Step 5 of 14
Layout & configuration
Step 6 of 14
Step 7 of 14
Quality & materials
Step 8 of 14
Additional features
Select any extras you're including. Each adds to your total. If none apply, click Next to continue.
Step 9 of 14
Site conditions & access
Step 10 of 14
What's your timeline?
Trades charge a premium for urgent or short-notice work. A flexible timeline gives you access to the best tradespeople — not just the available ones.
Step 11 of 14
When was your home built?
Older homes carry hidden costs — asbestos, outdated wiring, and non-compliant plumbing are common surprises once walls are opened.
Step 12 of 14
What type of property is it?
Apartments carry additional compliance requirements, building-management approvals, and restricted trade hours — all of which affect cost and timeline.
Step 13 of 14
How will you manage the renovation?
Self-managing means you hire and coordinate the trades — not that you do any of the work yourself. We'll show you exactly where the saving comes from on your results.
Step 14 of 14 — Almost there
A few final details for a precise estimate
Two things move real money on any renovation — where the property is, and whether the layout changes structurally. This sharpens your figure.
YOUR ESTIMATE: —
STOP OVERPAYING
—
on your renovation
Your free report shows you exactly where you could save
✓

Where every dollar goes — trade-by-trade breakdown so nothing surprises you

✓

How much you could save — the exact figure, itemised by where it comes from

✓

The 5 risks that blow most budgets — specific to your renovation type, with costs

✓

Your 12-phase protection plan — what to do, in order, from first decision to final payment

★★★★★

“Every quote I got had a massive management fee tacked on just for ‘coordination’ — which basically meant paying someone to make phone calls I could make myself. I’m glad I found this first.”

Megan T. · Verified review

Your report is ready — where should we send it?

Enter your email and your full cost breakdown arrives instantly. No spam — just your renovation report and occasional planning insights from Property Blueprint Co. Unsubscribe any time.

✓ Arrives instantly✓ No spam, ever✓ Unsubscribe any time
YOUR ESTIMATE: —
STOP OVERPAYING
—
on your renovation
—
Already got a builder’s quote?
Paste the total — we’ll sanity-check it against your estimate.

Free Renovation Cost Calculator

Pick your region — Australia, New Zealand, the United Kingdom, Ireland, the United States or Canada — and the renovation cost calculator gives you an instant, room-by-room cost estimate in your local currency, with figures specific to that region (not a currency conversion). It is a free renovation cost estimator for kitchen, bathroom, laundry, outdoor and full-home renovations, built from real project data — not a generic online range. No sign-up is required, and the estimate is instant.

How the renovation cost calculator works

Choose your region, choose your renovation type, and answer a few short questions about size and finish quality. The calculator returns a structured cost estimate broken down by category — so when the first quote lands, it arrives with context rather than shock. Use it as your independent benchmark before you speak to a single trade.

What the renovation cost calculator covers

The calculator estimates kitchen, bathroom, laundry, outdoor and full-home renovation costs across all six regions it supports — Australia, New Zealand, the United Kingdom, Ireland, the United States and Canada — each in its own local currency. Every estimate is adjusted for renovation scope and quality tier, because a budget refresh and a premium rebuild are not the same project.

Renovation cost calculator — frequently asked questions

Which countries does the renovation cost calculator cover?

Six regions: Australia, New Zealand, the United Kingdom, Ireland, the United States and Canada. Select your region in the calculator and the figures and currency adjust to that region — they are region-specific, not exchange-rate conversions.

Is the renovation cost calculator free?

Yes. The calculator is completely free to use, with no payment and no obligation. You can run as many estimates as you like.

How accurate is the renovation cost estimate?

Each estimate is built from real renovation project data for your selected region and structured by room type and quality tier. It is a planning benchmark designed to give you context before formal quotes — not a fixed quotation.

When should I use a renovation cost calculator?

Use it before your first trade conversation. A structured estimate in hand means you can judge whether a quote is fair, what should be included, and where a number sits relative to the market.

Common Questions

  • Each complete system includes four core Modules — The Renovation Blueprint (the 12 Phase System in full), The Protection Guide (the costly mistakes, trade red flags and blind spots for your room), The Planning Toolkit (12 interactive working tools), and The On-Site Handbook (five reference sheets built for your phone, with or without signal). You also receive free access to the Renovation Cost Calculator. Every Module is included. Nothing is sold separately.

  • Neither. The Renovation Blueprint is a complete self-managed planning system. It is not content you watch, and it is not coaching where someone advises you. It is a practical working system of documents and tools you use throughout your actual renovation — at your own pace, on your own timeline, without any sessions or schedules.

  • Yes — this was built specifically for first-time renovators. Every phase assumes you are starting from scratch. The system walks you through every decision in the right order, tells you what to ask every trade, and shows you what good work looks like before you sign off. You do not need prior experience. If you can manage people and professional accountability in a work context, you already have every skill this system requires.

  • Searching online gives you fragments — individual answers to individual questions with no system connecting them. The Renovation Blueprint gives you the complete sequence: every decision in the right order, every trade coordinated correctly, every red flag identified before it costs you. The information is not new. The system connecting it — delivered at the moment it is useful, not after the fact — is what no amount of Google research can provide.

  • The system is still valuable mid-renovation. Start with the phase that corresponds to where you currently are. The Protection Guide and Planning Toolkit are useful at any stage. The On-Site Handbook is particularly valuable once you are on site.

  • We offer a 30-day money back guarantee on all products. If you have used the system and do not find it valuable, email hello@propertyblueprintco.com within 30 days of purchase and we will refund you in full. No conditions. No forms. No questions beyond what would help us improve.