The Bathroom Renovation Blueprint — complete bathroom renovation planning system for Irish homeowners, shown on laptop, tablet and phone

The Bathroom Renovation Blueprint – IE Edition

€117,00 EUR
Sale price  €117,00 EUR Regular price 
Skip to product information
The Bathroom Renovation Blueprint — complete bathroom renovation planning system for Irish homeowners, shown on laptop, tablet and phone
Know every phase, every cost, every decision.

The Bathroom Renovation Blueprint – IE Edition

€117,00 EUR
Sale price  €117,00 EUR Regular price 
★★★★★16 reviews
One payment. No subscription. Yours permanently.
30-day money-back guarantee - no questions asked.
Payment methods
  • American Express
  • Apple Pay
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Union Pay
  • Visa
★ 4.94 from verified homeowners·Instant download·Lifetime access·30-day money-back guarantee·No subscription·Works offline·

What is the Bathroom Renovation Blueprint?

It's the complete planning system for an Irish bathroom renovation — the 12 phases, every cost, and the exact questions to ask, from first design brief to final sign-off and Certificate of Compliance on Completion. It puts you on equal footing with the trades, whether you run the job yourself or hire a builder. Four interactive modules — the Blueprint, the Protection Guide, the Planning Toolkit and the On-Site Handbook — plus a Renovation Cost Calculator. Yours permanently, for every bathroom you ever renovate.

Format: Interactive, works offlineFor: Irish homeowners & investors · any bathroom, refresh to rebuildDelivery: Instant download
What unpreparedness costs

What does it cost to walk into a bathroom reno unprepared?

On an Irish bathroom — whether it's a €5,000 refresh or a €7,000 to €22,000 (and more again in Dublin) full job — arriving unprepared costs more than it should: on a bigger job, the larger amounts below; on a smaller one, the overpriced quote or the variation you didn't spot. Not as one bill you'd notice, but as a handful you don't.

A waterproofing membrane that fails after tiling — rip out, re-waterproof and re-tile the wet area€4,000 – €12,000+
A single verbally approved variation — not in writing, not verified€1,200 – €5,000
Misaligned quotes — comparing different scopes without realising it€2,500 – €8,000
Releasing final payment before the defects list is raised€1,200 – €4,000
The Bathroom Renovation Blueprint€117 EUR

Stop one unnecessary variation, or catch one overpriced quote, and the Blueprint has paid for itself — even on a modest update. It protects most when you have it before you sign anything.

What's inside

What's inside the Bathroom Blueprint?

One system, four modules, plus the Renovation Cost Calculator. The Blueprint teaches you the 12 phases; the other three hand you the tools to run them — a risk guide, a working toolkit, and an on-site handbook for your phone.

Built from years of hands-on renovation experience — every phase tested on real Irish projects, not theory.

Module 1 · The Foundation

The Renovation Blueprint

The 12 Phase System in full — what should happen at every phase, when, and what to ask. 131 decision points across 12 phases.

Module 2 · The Risk Layer

The Protection Guide

48 costly mistakes, 15 trade red flags and 17 bathroom blind spots — what goes wrong on every bathroom, before it goes wrong on yours.

Module 3 · The Working Tools

The Planning Toolkit

12 interactive tools that keep your budget, variations and payments under control — saving automatically, working offline.

Module 4 · On-Site

The On-Site Handbook

5 reference sheets — measurements, build sequence, daily checks, payments, contacts — on your phone, with or without signal.

Module 1 — The Bathroom Renovation Blueprint
The Bathroom Renovation Blueprint module 1 — the 12 Phase System for an Irish bathroom renovation, shown on a tablet
Module 1 · The 12 Phase System
Module 2 — The Bathroom Protection Guide
The Bathroom Protection Guide — 48 costly mistakes, 15 trade red flags and 17 blind spots for Irish bathroom renovations
Module 2 · 48 mistakes · 15 red flags · 17 blind spots
Module 2 · The Risk Layer
The Protection Guide

You walk in already knowing what goes wrong on a bathroom — before it has the chance to go wrong on yours.

48Costly mistakes
15Trade red flags
17Blind spots

Not theory — the specific things that go wrong on Irish bathrooms: the charge-up arrangement that should have been fixed-price, the contract term no one flagged, the trade who won't put a major job in writing. The red flags are sorted by where they surface — quoting, on site, on invoices — so you catch the wrong trade in the quoting phase, before any money changes hands. With €2,500–€25,000+ on the line, reading this before you sign changes what you ask and what you refuse to approve.

What it protects you from

Signing with the wrong trade. You learn to read the warning signs in the quoting phase — before any money has changed hands.

Module 3 — The Bathroom Planning Toolkit
The Bathroom Planning Toolkit — interactive budget, variation and payment trackers for an Irish bathroom renovation
Module 3 · The Planning Toolkit — quoted vs actual, auto-calculated
Module 4 — The On-Site Handbook
The Bathroom On-Site Handbook — measurements, build sequence and payment reference sheets built for your phone
Module 4 · 5 on-site reference sheets — built for your phone
Module 4 · On-Site
The On-Site Handbook

The right numbers and the right questions in your pocket — so you can check any trade's work before they move on.

A bathroom site is loud, fast, and no place to read a manual. The Handbook strips everything down to 5 reference sheets built for your phone — so when the tiler asks about falls to the gully or the electrician about zones and socket placement, you answer with the number, not a shrug.

01
Measurements & clearances
Irish-standard vanity heights, fixture clearances and electrical IP zones.
02
Build sequence & trade order
The fixed order trades must follow — do not reorder.
03
On-site daily operations
What to check, photograph and log on every visit.
04
Payments, compliance & handover
Milestone hold-points — stop & verify before you pay.
05
Key contacts & site details
Every trade and registration number in one place.
Prepared vs unprepared

Your bathroom is decided before the first trade arrives.

Where it counts
Without a plan
With the Blueprint
BudgetWhat it all ends up costing
Money slips away. Set by surprises and overruns
Your money stays yours. Held to the plan, not to surprises
VariationsChanges made mid-build
Surprise bills land later. Agreed verbally, priced on the spot
No surprise bills. Every change agreed in writing first
PaymentsWhen money is released
Your cash, exposed. Released whenever the builder asks
Your cash, protected. You pay only for work that's done
QuotesHow you compare builders
Guesswork, not clarity. Compared apples to oranges
Confidence, not guesswork. Compared like-for-like, line by line
Your positionWhere you stand in it all
At the mercy of the job. Hoping it goes to plan
Calm and in control. You set the terms, start to finish
Behind the 12 Phase System

This Blueprint wasn't written from a textbook. Every phase, checklist and red flag in it came out of managing real renovations end to end — comparing quotes line by line, getting variations agreed in writing before they turned into invoices, and holding final payment until every defect was fixed. It's the method that worked on real projects, written down so you can run yours the same way.

“The builder quoting your bathroom has had this conversation a hundred times. They know the process, they know where the money moves, and they know which homeowners ask the right questions and which don't. Property Blueprint Co. exists to put you on equal footing — to give you the framework the trade already has.”

— Mossy · Founder, Property Blueprint Co.
Who this is for

Is the Bathroom Blueprint right for you?

Built for you if…

  • You're updating your bathroom — anything from a €5,000 refresh to a full renovation — and want to stay in control, whether you manage it yourself or hire a builder
  • You have quotes back and no reliable way to tell if they're accurate, comparable or fair
  • You're about to sign a building contract and want to know exactly what to check first
  • Your renovation starts in the next 1–12 months
  • You've had a renovation go sideways before and are determined not to repeat it
  • You're an investor managing a bathroom renovation on a rental anywhere in Ireland

This is not a DIY construction guide

  • You'll still hire competent, registered trades — a Safe Electric (RECI) registered electrician and an RGI registered installer for any gas — the system assumes you will
  • What it teaches is everything around the trades: how to brief, compare, contract and manage them, and handle variations
  • No prior renovation experience required
  • No building or trade background required
  • Built for first-timers — and for people who learned the hard way last time
Before you decide

Bathroom renovation questions, answered

Do I need planning permission or Building Control approval for a bathroom renovation in Ireland?
Bathrooms trigger permission and compliance steps more often than other rooms. A like-for-like swap of fixtures in the same positions may not need planning permission, but re-waterproofing a wet area, moving plumbing or drainage, or changing the layout generally requires a commencement notice and may need planning permission — and waterproofing must comply with the Building Regulations (TGDs) and the I.S. EN waterproofing standards. Phase 4 of the Blueprint shows you exactly which side of that line your project sits on, the notifiable work under BCAR that must be done or supervised by a registered builder (CIRI) and registered trades, and which plumbing and electrical certificates to collect before final payment — ending in a Certificate of Compliance on Completion lodged on the BCMS.
What contract should I have in place for a bathroom renovation in Ireland?
On any bathroom renovation a written contract is essential — never rely on a verbal agreement. Notifiable work under BCAR needs an Assigned Certifier and full compliance, ending in a Certificate of Compliance on Completion lodged on the BCMS. Make sure the trades are suitably registered — a Safe Electric (RECI) registered electrician for electrical work and an RGI registered installer for any gas — and that your protections under the Building Control Regulations and your build contract apply. The Blueprint walks you through what must be in that contract, and the Protection Guide flags the red flag of a builder who won't put a substantial job in writing.
Will this work whether I manage it myself or hire a builder?
Both. Run the bathroom yourself, or use it to stay in control while a builder does the work — either way you'll know what should happen at every phase and exactly what to ask, so nothing important gets decided without you.
I have no renovation experience. Will it work for me?
Yes. It's built for homeowners managing a bathroom renovation for the first time — or who've done it before and learned the hard way what they didn't know. No building knowledge is assumed: every phase is in plain language, every action is specific, and every tool is pre-populated so you're never staring at a blank screen.
My renovation has already started. Is it too late?
No — but the earlier the better. At the quoting or contracting stage you get the most from the 12 phases in sequence. If you're already mid-build, open the Planning Toolkit immediately — the Variation Log, Site Diary and Payment Tracker are useful from day one, and the Protection Guide is relevant at any point.
Is this a PDF or e-book?
No. All four modules are interactive guides that open in any browser on any device — the Planning Toolkit saves your figures as you work and runs completely offline, with nothing to install and no account. It's a working system you use throughout the renovation, not a static document you read once.
Is it really worth €117?
Stop a single unnecessary variation, or compare one set of quotes properly, and it typically pays for itself many times over — against a bathroom that runs €7,000 to €22,000-plus. And it's one payment, kept for every renovation after this one.
Is there support if I get stuck?
Yes — personal email support. Email us with any question about your renovation and you'll hear back from a real person who knows the system. Not a chatbot, not a ticket queue.
What is a realistic budget for a bathroom renovation in Ireland?
A realistic budget is the one built from your scope rather than someone else’s average — the spend is set by your finishes, your layout and the trades your bathroom pulls in. The Blueprint includes a cost planner that prices your renovation trade by trade, so you know your number before the first quote arrives.
How long does a bathroom renovation take?
Longer than the brochure answer, and the difference is rarely the speed of the trades — it is the order they arrive in. Duration is set by trade sequence, and one missed hand-off can idle a site for a week. The Blueprint’s timeline tool maps your sequence, so the calendar is set by your plan rather than by whoever turns up next.
What do verified buyers say?
The Blueprints are rated 4.9 out of 5 by verified buyers. Their words are better evidence than ours — read the reviews here.